Quotation Are Invited For Oem Specialist Services/ Supervision (M/S Bopp & Reuther - Cci ) During Replacemen ... in United Arab Emirates
Tender Notice
TenderID
116095803
Tender Brief
Quotation Are Invited For Oem Specialist Services/ Supervision (M/S Bopp & Reuther - Cci ) During Replacement / Repair Of Hp/Lp-2 Pcv Outlet Pr Tube At L2 Station
Quotation are invited for OEM Specialist Services/ Supervision (M/S Bopp & Reuther - CCI ) during Replacement / Repair of HP/LP-2 PCV Outlet PR Tube at L2 Station 1-Oem Specialist Services/ Su 1032603412 1 ITEM-00001 TECHNICAL AND GENERAL SPECIFICATIONS,OUTSOURCING WORK L2 STATION PHASE II, JEBEL ALINAME OF WORK: OEM SPECIALIST SERVICES/ SUPERVI SION (M/S BOPP & REUTHER- CCI ) DURING REPLACEMENT / REPAIR OF HP/LP-2 PCV OUTLET PR TUBE DURATION OF WORK: 04 DAYS DURING REPLACEMEN T OF PR TUBE (TENTATIVE DATEOF SHUTDOWN-01.11.2026)SCOPE OF WORK:·#OEM (M/S BOPP & REUTHER-CCI) SPECIALIST SERVICES/ SUPERVISIONREQ UIRES DURING THE REPLACEMENT / REPAIR OF HP/LP PRESSURE CONTROLVALVE PRESSURE REDUCING TUBES (CLOSURE)·#OEM M/S BOPP & REUTHER-CCI SHALL PROVIDE WPS, CHECK LIST AND METHODOF STATEMENT (STEP BY STEP PROCEDURE) FOR REPLACEMENT OF PR TUBE.·#VERIFY AND ADVISE THE LOC ATIONS FROM WHERE THE LINES ARE TO BE CUTBEFORE START OF THE WORK.·#VERIFY THE SPARES PRIOR TO CUT THE PR TUBE.·#CHECK AND 4 DAY INSPECT A LL THE STEP-BY-STEP PROCEDURES FOR PR TUBEREPLACEMENT AND PROVIDE THE COMMENTS.·#AFTER REMOVAL OF THE EXISTING PR TUBE, SPECIALIST M UST CHECK AND VERIFY THE ALIGNMENT OF THE CONNECTION RING.·#PROVIDE PROPER GUIDANCE DURING THE WORK.·# FINAL INSPECTION AND APPROVAL FOR EACH STEP AS PER CHECKLIST/ METHODOF STATEMENT.·#OEM SHALL SUBMIT THE WORK COMPLETION REPORT WITH REPLACEMENTPROCEDURE, CHECK L IST, DRAWINGS AND STEP BY STEP PR TUBE REPLACEMENTPHOTOS.·#MULTIPLE VISITS MAY BE REQUIRED UNTIL COMPLETION OF THE JOB. TOTAL 4DAYS VISIT WILL BE DONE AS PER SITE REQUIREMENT.·#WORK WILL BE DONE BY EXTERNAL CONTRACTOR (SEPARATE PO WILL BE ISSUEDBY DEWA). OEM SPECI ALIST ONLY HAS TO PROVIDE PROPER GUIDANCE/SUPERVISION DURING THE PR TUBE REPLACEMENT AND ENSURE THE WORK WILL BEAS PER THE APPROVED METHOD OF STATEMENT.DEWA SCOPE·#EXTERNAL CONTRACTOR FOR THE PR TUBE REPLACEMENT·#INSULATION MATERIAL AND CLADDING SHEET IF REQUIRE·# SUPPLY OF PR TUBES·#NDT INCLUDES RT, MPI, PT AND PWHT.·#SCAFFOLDING·#CRANE·#FORKLIFT SPECIAL NOTES / INSTRUCTIONS: 1-OEM SPECIALIST SERVICES/ SUPERVISION (M/S BOPP & REUTHER - CCI ) DURING REPLACEMENT / REPAIR OF HP/LP-2 PCV OUTLET PR TUBE AT L2 STATION CONTACT - S.ARUN KUMAR / 0568048912 / arunkumar.sethuraman@dewa.gov.ae STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332601798)/$value
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 116095803
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.