|
1. The Subject Of The Order Is The Comprehensive Thermal Modernization Of The Gymnasium And Common Room At The Primary School Building In Szówsko.2. The Scope Of The Order Includes The Following Construction Works: Preparatory Works And Earthworks, Demolition Of The Paving Stone Band (Bumper Guards), Demolition Of The Existing Insulation Of The Foundation Walls, Moisture-Proof Insulation With Bituminous Coatings, Vertical (2 Layers), Insulation Of The Foundation Walls Of The Building With Styrodur, Thickness. 6 Cm., Vertical Insulation Made Of Dimpled Foil, Substructure Made Of Natural Aggregate, Thickness. 8 Cm. After Compaction, Surface Made Of Paving Stones. 6 Cm. On Cement And Sand Bedding Thick. 5 Cm., Installation Of External Scaffolding, Demolition Of Downpipes, Forging External Window Sills From Sheet Metal, Preparation Of The Old Surface For Painting The Facade, Painting The Facade With Silicone Paint, Installation Of Downpipes Made Of Coated Sheet Metal With A Diameter Of 15 Cm., Sheet Metal Flashings - External Window Sills Made Of Coated Sheet Metal, Construction Of A Plinth With Mosaic Plaster, Replacement (Disassembly And Assembly) Of Pvc Windows - Three-Glazed With Processing Of The Covering, Replacement (Disassembly And Assembly) Of Aluminum Door Joinery With Processing Of The Filling, Dismantling Of The Central Heating Installation. Made Of Steel Pipes With A Diameter Of 20 Mm And Radiators, Installation Of Central Heating Installations. At Wed. 25 Mm With Clamp Connections Together With The Installation Of Double-Plate Steel Radiators And Thermostatic Valves, Processing Of Chimneys Above The Roof Made Of Galvanized Coated Trapezoidal Sheet T7 In The Color Of The Roof Covering, Dismantling Of The Old Lightning Protection System For Horizontal Steel Wire Air Terminals On The Roof, Installation Of A New Lightning Protection System For Horizontal Air Terminals On The Roof Made Of Steel Wire With A Diameter Of Min. 8Mm. Including Disassembly Of Old Pvc Roof Gutters, Installation Of Roof Gutters Made Of Coated Sheet Metal With A Diameter Of 150 Mm. Including Inclusion In The Existing Downspouts, Ball Catchers On The Front Walls Of The Gymnasium, Replacement Of Lighting Fixtures In The Gymnasium,3. A Detailed Description Of The Subject Of The Contract Is Specified In The Following Documents: 1) Investors Cost Estimate And Bill Of Quantities, 2) Technical Specifications For The Execution And Acceptance Of Construction Works 4. All Documents Describing The Subject Of The Contract Should Be Treated As Mutually Complementary In The Sense That In The Event Of Any Discrepancies, Ambiguities Or Ambiguities, The Contractor Cannot Limit The Scope Of His Obligations Arising From The Contract Regarding The Awarded Public Procurement.5. The Required Minimum Warranty/Warranty Period For All Parts Is 36 Months, From The Date The Ordering Party Receives The Subject Of The Order And Signs The Works Acceptance Protocol,
|