|
1) The Subject Of The Order Is The Construction Of A Civil Protection And Civil Defense Warehouse Building With A Hiding Place, Along With The Necessary Technical Infrastructure And Land Development, On Plot No. 614/3, Karsin District. Building Dimensions: 10.50 M X 20.50 M. Gable Roof With An Inclination Angle Of 35º. Characteristic Parameters Of The Building: - Width Of The Front Façade - 12.75 M, - Length Of The Side Facade - 20.50 M, - Building Height - 8.72 M, - Building Area - 241.38 M2, - Usable Area - 313.29 M2, - Volume - 758.52 M3, - Number Of Underground Floors - 1 - Number Of Above-Ground Floors (Including The Attic) - 1. Scope Of Works: A) Construction Of Reinforced Concrete Foundations, B) Construction Of External Monolithic Reinforced Concrete Walls, C) Construction Of Internal Walls Made Of Blocks, D) Construction Of A Monolithic Reinforced Concrete Ceiling, E) Construction Of External Walls Of The Warehouse From Sandwich Panels, F) Construction Of A Roof From Sandwich Panels, G) Construction Of Damp-Proof Insulation Of Foundations, H) Construction Of Thermal Insulation Of External Walls, I) The Steel Structure Should Be Secured Anti-Corrosion,J) Make Roof Slope Bracings,K) Make Window And Door Joinery In Accordance With The Documentation,L) Make Gutters,M) Make Necessary Installations, I.E. Electricity, Water And Sewage. Notes! - Providing An Information Board In Accordance With The Template Of Information Boards Specified In Annex No. 1 To The Regulation Of The Council Of Ministers Of May 7, 2021 On Determining Information Activities Undertaken By Entities Implementing Tasks Financed Or Co-Financed From The State Budget Or State Earmarked Funds (Journal Of Laws, Item 953, As Amended) - The Content On The Board Should Be Agreed With The Ordering Party. - Painting Floors With Rubber Paint. - Walls Up To A Height Of 1.80 M, Painted In A Color Selected By The Ordering Party. - Tiling The Entire Bathroom (Walls + Floor), Tiles To Be Chosen By The Ordering Party (Size 60 X 120Cm).- In The Kitchen Area, The Walls Should Also Be Tiled Where The Kitchen Countertops Are Located. The Contractor Will Provide Basic Kitchen Equipment, I.E. Sink, Cabinets, Countertops In The Color Chosen By The Ordering Party.2) According To The Common Procurement Vocabulary (Cpv), The Subject Of The Order Covers The Scope Defined By The Codes: 45000000-7 - Construction Works, 45200000-9 - Construction Works In The Field Of Construction Of Complete Buildings Or Their Parts And In The Field Of Civil Engineering, 45260000-7 Works In The Field Of Roof Coverings And Structures And Other Similar Specialized Works, 45262000-1 Special Construction Works, Other Than Roofing.3) The Contractor Is Obliged To Compare The Compliance Of The Submitted Studies And In The Event Of Any Discrepancies, He Is Obliged To Ask The Ordering Party In Writing For An Explanation As Soon As Possible. In The Event Of Differences In Technological Solutions (Including The Materials And Devic
|