|
Quotation Are Invited For Supply, Replacement, Testing And Commissioning Of Spx Marley Cooling Tower (3 Nos) Pvc Fill Packs (Infills) At Head Office. Supply, Replacement, Testing And Commissioning Of Spx Marley Coolingtower (3 Nos) Pvc Fill Packs (Infills) At Head Office.1. Genera L Scopethe Contractor Shall Be Responsible For The Complete Engineering,Supply, Delivery, Dismantling, Removal, Replacement, Install Ation,Testing, Commissioning And Handover Of The Existing Spx Marley Coolingtower- (3 Nos) Pvc Fill Packs (Infills) Installed At Dew A Head Officecooling Towers. The Work Shall Include All Labour, Supervision,Transportation, Vehicles, Cranes, Lifting Equipment, Sca Ffolding, Tools,Consumables, Temporary Works, Safety Measures, Testing Instruments,Cleaning Materials And All Accessories Necessary To Provide A Completeand Fully Operational Cooling Tower System In Accordance With Dewarequirements.2. Mandatory Site Visitthe Contractor Shall Carry Out A Mandatory Site Visit Prior Tosubmission Of The Quotation To Verify The Actual Cooling Towerconfiguration, Fi Ll Dimensions, Quantity, Access Conditions, Liftingrequirements And The Condition Of All Internal Components. Submission Ofthe Propo Sal Shall Be Deemed As Confirmation That The Contractor Hasfully Assessed The Site Conditions And Included All Associated Costs. Noc Laims Arising From Failure To Inspect The Site Shall Be Entertained.3. Removal Of Existing Pvc Fill Packsthe Contractor Shall Carefu Lly Dismantle And Remove All Existing Pvcfill Packs Without Causing Damage To The Cooling Tower Casing,Structural Members Or Adjacen T Equipment. The Contractor Shall Isolatethe Cooling Tower, Provide Temporary Protection Where Necessary Andensure Safe Execution Of The Dismantling Works.All Dismantled Pvc Fill Packs, Damaged Materials And Scrap Generatedduring The Works Shall Be Removed From Th E Site.4. Transportation And Disposal Of Scrap Materialsthe Contractor Shall Provide All Vehicles, Drivers, Labour, Liftingequipment And Transportation Necessary To Collect, Load, Transport Andunload All Dismantled Pvc Fill Packs And Associated Scrap Materials Tot He Dewa Ruwaiyah Scrap Yard.The Contractor Shall Obtain Written Acknowledgement Of Material Deliveryfrom The Dewa Representative And Submit The Same As Part Of The Projectclose-Out Documentation.5. Internal Cleaning Of Cooling Tower Dewa-Confidentialimmediately Af Ter Removal Of The Existing Fill Packs, The Contractorshall Thoroughly Clean The Entire Internal Cooling Tower Including Thebasin, F Ill Support Structure, Casing, Spray Piping, Distribution Systemand All Accessible Internal Surfaces.All Accumulated Scale, Algae, B Iological Growth, Mud, Debris, Corrosionproducts And Loose Deposits Shall Be Completely Removed Beforeinstallation Of The New Fill M Edia.6. Inspection Of Internal Cooling Tower Componentsfollowing Removal Of The Fill Packs, The Contractor Shall Carry Out Acomprehe Nsive Inspection Of All Internal Cooling Tower Components.Any Damaged, Deteriorated, Corroded, Cracked, Loose Or Defectivecomponents Identified During Dismantling Or Installation Shall Bereplaced Immediately At No Additional Cost To Dewa. Qty: 3 Supply, Replacement, Testing And Commissioning Of Spx Marley Cooling Tower (3 Nos) Pvc Fill Packs (Infills) At Head Office. Contact: Mohideen/ 553810513 Site Visit: 20.07.2026 @10:00 Payment: After Completion Of Work Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Supplier Registration: Https://Srm.Dewa.Gov.Ae/Irj/Portal/Anonymous/Regis Tender Link : Https://Srm.Dewa.Gov.Ae/Sap/Opu/Odata/Sap/Zsrm_Rfx_Reg_Bid_Srv/Attachmentset(2332601721)/$Value
|