2. Description Of The Subject Of The Order, In Accordance With Art. 99-103 Of The Public Procurement Law: 2.1 The Subject Of The Order Is The Performance Of Construction Works Consisting In The Reconstruction Of Ul. Ustronie Leśne, Including The Road, Sidewalks And Exits, Adjustment And Construction Of Curbs And Edges, Construction Of A Pedestrian Crossing With Lighting, Construction Of Storm Drains, And Renovation Of Sanitary Sewage Wells.2.2 The Task Will Include, Among Others: The Following Construction Works:• Milling Of Bituminous Surface. • Demolition Works Including, Among Others: Existing Curbs, Sidewalks, Exits, Surface Made Of Mineral-Bituminous Mass, Sub-Bases, Reinforced Concrete Road Slabs And Openwork Slabs.• Dismantling Of Vertical Markings.• Reconstruction Of The Road Surface With A Mineral-Asphalt Mixture On The Section Of The A-B And C-D Roads.• Construction Of A New Road Structure Made Of Eco-Domino Concrete Cubes On The Section Of The E-F And G-H Roads. • Widening Of The Existing Road Structure. • Reconstruction Of Sidewalks, Accesses To The Property And Exits. • Introduction Of Permanent Traffic Organization. • Regulation Of Underground Infrastructure. • Construction Of A Pedestrian Crossing With Street Lighting. • Construction And Adjustment Of Street Elements (Curbs, Edges, Stops). • Construction Of Surface Drainage. • Renovation Of The Sanitary Sewage System Located On Plot No. 206 Rev. Międzyzdroje 21 (Founding The Well Without Changing The Elevations), Including The Dismantling Of The Cast Iron Manhole For The Zwik Section. • Replacement Of Reducers And Manholes Of Sanitary Sewage Wells, The Location Of Which Is Detailed On The Site Plan. After The Works Are Completed, The Full Road Surface Structure With Dimensions Of 2.00 X 2.00 M Should Be Reconstructed. • Preparation Of The Area For Planting Grass In The Ground And Construction Of Carpet Lawns. No Cutting Down Of Trees Is Planned As Part Of The Construction Works. In Addition, Construction Works Will Include Work On The Regalinda Natural Monument, Therefore These Works Should Be Carried Out In Accordance With The Tree Protection Project Developed By Marcin Kubus, Ph.D. Eng. The Above Should Be Carried Out In Accordance With The Design Documentation. 2.3. It Is The Contractors Responsibility To Notify The Network Operators: Water Supply, Sewerage, Telecommunications, Power Plant, Gas Plant, Telecommunications Companies About The Planned Start Date Of The Investment, Which Have Their Utilities Within The Zone. Road Supervision And Presentation Of Any Acceptance Protocols - If Required. 2.4. A Detailed Description Of The Subject Of The Order Constitutes A Technical And Executive Design, Technical Specification For The Execution And Acceptance Of Works, And Detailed Technical Specification, And On This Basis The Offer Should Be Priced. Technical Specification For The Execution And Acceptance Of Works And In The Detailed Technical Specification, Including, Among Others, T
|