1. Subject Matter Of The Orderthe Subject Of The Order Is The Performance Of Construction Works Consisting In The Reconstruction Of The Internal Road No. Dwhu-3 Located In The Town Of Hureczko On Plots No. 271/5 And 129/57. The Scope Of The Works Includes The Performance Of All Construction Works, Supplies Of Materials, Transport, Preparatory Works, Earthworks, Construction Of The Surface Structure, Surface Drainage, Finishing Works And All Activities Necessary For Proper Execution Investment.2. Material Scope Of The Worksthe Scope Of The Order Includes In Particular: Preparatory Works - Geodetic Marking Out Of The Works, - Indication Of The Boundary Points Of The Road, - Measurement Works, - Securing The Work Area, - Traffic Organization For The Duration Of The Works, - Demolition Of Existing Pavement Elements, - Demolition Of Existing Curbs. Earthworks Execution Of: - Trenching For The Designed Structure, - Excavations, - Profiling And Compaction Of The Subsoil, - Removal Or Management Of Excess Soil, - Preparation Of The Foundation. Construction Of The Exit Structures. The Scope Includes The Construction Of: - Crushed Aggregate Foundation, - Upper Foundation Layer, - Binding Layer Of Asphalt Concrete, - Asphalt Concrete Wearing Course, - Setting Of Concrete Curbs, - Construction Of Concrete Footings. Reconstruction Of The Road. The Scope Includes The Construction Of: - Bed, - Basic Sub-Base, - Upper Sub-Base, - Ac Binding Layer, - Ac Wearing Course, - Construction Of Aggregate Roadsides, - Execution Of All Connections To Existing Roads. Side Road. Execution Of: - Earthworks, - Crushed Stone Structure, - Compaction, - Profiling. Finishing Worksin Particular: - Topsoiling, - Sowing With Grass, - Tidying Up The Area, - Restoring Adjacent Areas, - Tidying Up The Road. The Detailed Scope Of Works Is Presented In The Bill Of Quantities Constituting An Annex To Swz 3. Materialsall Materials Used For The Implementation Of The Investment Must: - Be Brand New, Except For The Aggregate For The Side Road, Which Will Come From The Bed Of The Main Road On Which It Is Currently Spread, - Have Declarations Of Performance Properties, - Have The Required Certificates, - Meet The Requirements Of Pn-En, - Meet The Requirements Of The Construction Products Act. 4. Requirements For The Execution Of Works. The Contractor Will Be Obliged To: - Provide A Construction Manager, - Carry Out The Works In Accordance With The Design Documentation, - Comply With Occupational Health And Safety Regulations, - Secure The Construction Site, - Mark The Works, - Carry Out The Works While Maintaining Access To The Property, - Ongoing Maintenance Of Road Cleanliness. 5. As-Built Documentation After Completion Of The Works, The Contractor Will Provide: - As-Built Documentation, - Approvals, - Certificates, - Declarations Of Conformity, - Laboratory Test Results, 6. Acceptance Of The Works. The Acceptance Conditions Will Be: - Performance Of All Works, - Removal Of Defects, - Set Of A
|