1. Full Name Of The Investment: Modernization Of The Boiler Room In The Wielki Komorsk Community Center, Section 1115/7.2. Investment Location: Plots No. 1113, 1114 And 1115/7, Wielki Komorsk Registration District, Warlubie Registration Unit.3. Subject Of The Construction Project: The Subject Of This Construction Project Is The Construction Of An External And Internal Gas Installation, As Well As The Construction Of A Gas Boiler Room In The Building Of The Village Community Center. The Designed Gas Installation Covers The Section From The Reduction And Measurement Point To The Buildings Of The Village Community Center And The Volunteer Fire Department (Osp). The Facilities Will Be Powered By Natural Gas. The Investment Includes The Installation Of A Gas Condensing Boiler With A Capacity Of Up To 80 Kw, Which Will Meet The Demand For Central Heating, As Well As The Connection Of Gas Stoves Intended For Preparing Meals.4. Existing State Of Land Development: In The Area Covered By The Investment There Is A Community Center Building And A Fire Station. The Plot Has The Following Infrastructure: - Water Supply Network, - Sanitary Sewage System, - Sanitary Pressure Sewage System, - Enm.5 Electric Cable. Description Of The Designed Internal Gas Installation: The Designed Internal Gas Installation Is Intended For The Village Community Center Building And The Volunteer Fire Department Building, Located At 12 Nowska Street In Wielki Komorsk, On Plots With Registration Numbers 1113, 1114 And 1115/7. The Installation Is Planned To Be Made Of Seamless Steel Pipes Meeting The Requirements Of The Pn-En 10208-2+Ac Standard. All Gas Pipe Connections Should Be Welded. The Detailed Route Of The Installation And The Diameters Of Individual Pipeline Sections Are Presented In The Graphic Part Of This Study. Due To The Nature And Purpose Of The Modernized Buildings, The Community Center And Fire Brigade Facilities Covered By The Investment Were Classified Into The 9Th And 17Th Categories Of Building Structures, Respectively. Boiler Room: The Room Intended For Boiler Installation Must Meet The Requirements Specified In The Pn-B-02431-1:1999 Standard. The Structure Of The Existing Separating Walls Consists Of Solid Brick Walls With Cement And Lime Mortar. As Part Of The Construction Works, It Is Planned To Build A New Separating Wall Made Of 12 Cm Thick Aerated Concrete Blocks, With A Fire Resistance Class Of Ei 60. A Window Will Be Installed In Place Of The Existing Chute, In Accordance With The Location And Parameters Indicated In The Graphic Part Of The Study. All Floor And Wall Finishing Surfaces In The Room Must Be Made Of Non-Flammable Materials. Additionally, An Artificial Lighting System With A Minimum Protection Level Of Ip 24 Should Be Used In The Boiler Room. Exhaust Gas Discharge: To Discharge Exhaust Gas From The Designed Boiler, The Existing Chimney Pipe Should Be Used, Indicated In The Graphic Part Based On The Inventory. Inside The Chimney, An Insert Made
Contact Information
Address
Gmina Warlubie,Warlubie,86-160,Kujawsko-Pomorskie,Pl618 - Świecki
Contact No.
523326040
Email
gmina@warlubie.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 116002426
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.