|
1. The Subject Of The Order Is The Execution Of Construction Works, Including: Implementation Of The 8Th Stage Of Conservation Works In The Ground Floor Of The Kórnik Castle, Including The Continuation Of The Process Of Desalination Of The Walls And Improvement Of The State Of Preservation Of The Historical Building Material. The Scope Of Work Includes Rooms No. 1, 2, 2A, 3, 4, 9C, 10, 13, 13A, 14, 14A, 15, 19, 20 And 21, As Well As Walls Requiring Emergency Intervention. The Works Will Consist In: • Cleaning The Wall Surfaces And Grouting The Walls And Vaults Made Of Historic Bricks With Salt-Absorbing Mortars (Room 1), • Replacement Of Desalination Compresses Along With Testing The Degree Of Salinity Of The Walls (Rooms 2, 3, 4, 13, 13A, 14, 14A, 15, 19, 20 And 21), • Making Salt-Absorbing Renovation Plasters After Removing Degraded Plasters And Cleaning The Wall Surfaces (Rooms 9C, 10 And 2A), • Disinfecting The Walls Bricks With Preparations That Combat Fungi And Microorganisms (Room 10), • Performing Additional Desalination Compresses On The Walls Requiring Emergency Intervention, With A Total Area Of 237.2 M². This Description Presents The Basic Scope Of The Planned Works. The Detailed Scope Of Works, Their Execution Technology, Material Requirements And The Method Of Carrying Out The Works Were Specified In The Design Documentation, Conservation Work Program, Bill Of Quantities And Other Order Documents. The Contractor Will Be Obliged To Carry Out All The Works In Accordance With These Documents. The Works Will Be Carried Out In Accordance With The Conservation Work Program, Design Documentation And Under Conservators Supervision.2. The Detailed Scope, Description And Method Of Performing Construction Works That Are The Subject Of The Order Are Specified In The Order: 1) Construction Project (Architecture Industry) Entitled: Renovation And Renovation Of The Internal Walls Of The Ground Floor Of The Castle In Kórnik - Of April 2019, Constituting Annex No. 8 To The Swz;2) Permits And Decisions, Including: - Decision No. 4804/19 Of August 27, 2019 - Building Permit; - Permit No. 109/A/2019 Of June 27, 2019 - Permission To Carry Out Conservation And Restoration Works On A Monument Entered In The Register Of Monuments; - Decision No. 23/A/2024 Of October 31, 2024 Concerns Changing The Date Of Conservation Permit No. 109/A/2019 Of June 27, 2019; Constituting Annex No. 9 To The Swz;3) Technical Specification For Execution And Acceptance Construction Works Called Renovation And Renovation Of The Internal Walls Of The Ground Floor Of The Castle In Kórnik - Of May 2019, Constituting Annex No. 10 To The Swz (Hereinafter Referred To As: Stwiorb); 4) Description Of The Subject Of The Order Regarding: The Scope Of Conservation Works Of The 8Th Stage Along With The Ground Plan Of The Kórnik Castle, Constituting Annex No. 11 To The Swz; 5) Bill Of Quantities Regarding Renovation And Renovation Of The Internal Walls Of The Ground Floor Of The Castle In Kór
|