Construction-Related Services – Project Management. Primary School At Dom-Pedro-Platz 2, General Renovation And Expansion Into An All-Day, 4-Class Primary School; Project Management Services Based On §2 Aho (Project Levels 1-5, Areas Of Action A-E) And Supporting Services For The Building Technology And Electrical Engineering Departments For General Repairs And Expansion To An All-Day, 4-Class Primary School In Accordance With The Standard Room Program Of The Primary School At Dom-Pedro-Platz 2, 9Th District, Munich Neuhausen-Nymphenburg. Initial Situation: The Primary School At Dom-Pedro-Platz 2 Is A Listed Solid Construction Building From 1899/1900 And Is Also Under Ensemble Protection. The Building Consists Of A Ground Floor On The Mezzanine Floor, Two Upper Floors, A Partially Converted Attic And A Basement In The Basement. The School Is Currently Organized In 5 ½ Classes And Housed In A Classic Hallway-Type Floor Plan. The School Also Has A Sports Hall In The Attic, A Gymnastics Room On The First Floor And The Thv Apartment. The Break Areas Are Located On The Schools Own Property. The Primary Schools Outdoor Sports Areas Are Located On Parcel 546/2 On The Opposite Side Of The Street And Are Accessible Via Dom-Pedro-Straße. The Existing School Is To Be Planned Into A Four-Class, All-Day Primary School Based On The Munich Learning House Concept. The Kitchen And Cafeteria Must Be Upgraded And Expanded For This Purpose. A New Extension Is Required For This. In Addition, The Primary School Has Numerous Structural Defects: Fire Protection Deficiencies In The Suspended Ceilings, Maceration On The Roof Cladding, Pollution, Local Moisture Problems On The External Walls, Overheating Of The Single Sports Hall In The Attic, Supporting Structure In The Gymnastics Room On The 1St Floor. In Order To Improve The Room Quality, A New Ventilation System Must Be Retrofitted In All Classrooms. Furthermore, The Elt Technical Areas Are Currently Inadequate. It Is Necessary To Create Space For Elt Technical Areas Throughout The Building. The Implementation Should Take Place In One Construction Phase. The Entire School Will Be Relocated To Another Location During Construction. The Organization Of Outsourcing Is Not Part Of The Planning. The Munich City Council Is Aiming For Climate Neutrality By 2035. Important Aspects Are The Use Of Renewable Raw Materials, Gray Energy Used, Circular Construction As Well As Reuse And Recycling Materials. New Buildings Should Be Built In Wood Or Wood Hybrid Construction With Green Buildings. Funding And Sustainability Certificates Are Intended To Ensure Quality And Environmental Aspects. Planning And Implementation Must Be Economical And Economical, Taking Into Account Follow-Up Costs Over The Entire Period Of Use. (See Decision In Principle Ii Climate-Neutral Munich 2035 And Climate-Neutral City Administration 2030: From Vision To Action Https://Risi.Muenchen.De/Risi/Sessionsvorlage/D
Contact Information
Address
Friedensstraße 40
Contact No.
000
Email
bekanntmachungen.vz2.bau@muenchen.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 115843617
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.