Tenders Are Invited For Strengthening Of Resources And Streamlining The Function Of The Water Supply Choustn ... in Czech Republic
Tender Notice
TenderID
115820230
Tender Brief
Tenders Are Invited For Strengthening Of Resources And Streamlining The Function Of The Water Supply Choustníkovo Hradiště So 03 Recirculation Of The Water Supply Network - Apartment Block Stage
The Subject Of The Order Is The Construction Of The Connecting Line Stašák (Pe Ø 160) Between The Existing Backbone Line Ø 160 Running Along Road Iii/29923 From The Reservoir U Millerů And The Backbone Line Ø 90 From The Reservoir Pod Kocbeří. The Route Is From Olfincar, Where, After Crossing The Local Road, It Will Connect To The Existing Ø 90 Rows From Vdj Pod Kocbeří Near The Apartments. At The Point Of Connection To The Ø 90 Lines From Vdj Pod Kocbeří, A Connection Will Also Be Made To The Parallel Ø 63 Line. This Line Will Be Terminated By This Connection And The Rest Of Its Route Will Be Taken Out Of Service. A Total Of 2 Dn 80, 1 Dn 150 And 1 Dn 50 Gate Valves Will Be Installed Here. The Installed Shutters Will Allow More Options For Supplying The Consumer During Shutdowns And Network Failures. As Part Of The Construction, The Node On Which There Are Now Two Armature Shafts At Apartment Building No. 50 Will Be Modified. All Fittings And Fittings Will Be Dismantled In The Square Shaft. The Existing T-Piece Dn80/80 Will Be Replaced By A New One With A Reduced Branch (Dn80/50). The Branch Will Be Connected To The Existing Pipe Ø 63 Running Along The Road To The Parsonage, The Connection For The Kindergarten Ø 40 And, For Now, The Pipe To The Former Shop Ø 40. New Closures Will Be Installed On All These Pipes In The Shaft. In A Straight Direction, The Dn 80 Pipe Will Continue Out Of The Shaft From The T-Piece, The Route Will Bend Behind The Shaft And End At The Edge Of The Existing Paved Area. The Above-Ground Sewage Hydrant Will Be Located Here. Both Ø 63 Connections For Apartment Buildings No. 50 And 51 Will Be Connected To This Pipe. Each Will Be Equipped With An Earth Connection Cap. All Fittings And Fittings Will Be Dismantled In The Circular Shaft, Then It Will Be Demolished And Filled In. Modification Of This Node Can Only Be Done After The Stašák Connecting Line Has Been Completed And Put Into Operation. The Water Connection For The Premises Of The Olfincar Company Will Be Connected To The New Connection Line. The Scope Of Work Is Determined By The Measurement Statement, Which Is An Integral Part Of The Tender Documentation For This Contract. The Construction Will Be Carried Out According To The Valid Building Permit - Attachment No. 4A) And 4B). The Complete Construction Will Be Carried Out In Accordance With The Project Documentation Strengthening Of Resources And Streamlining The Function Of The Water Supply System Choustníkovo Hradiště, So 03 Zukruhování Vodovdní Sětice Prepared By The Company Vodohospodáské Služby Rt, S.R.O., Horní Lánov 61, 543 41 Lánov, The Responsible Designer Is Ms. Ing. Eva Gebrtová, (Date 12/2019). All Work Will Be Carried Out In Accordance With The Valid Versions Of The Waterworks And Sewerage Act No. 274/2001 Coll., Which Establishes The Basic Legal Framework, And Implementing Decree No. 428/2001 Coll., As Well As In Accordance With Čsn En 805, Čsn 75 5411 And Tnv 75 5402. It Will Be Important To Prepare A Construction Schedule That Will Be In Tolerance With The Already Completed Construction Safety Modifications On The Road I/37 Due To The Influence Of The D11 Highway - Ii.Stage.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 115820230
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.