|
The Scope Of The Subject Of The Order Includes The Design And Implementation Of:1. Primary School No. 2 In Szamotuły, Ul. Kapłańska 18, 64-500 Szamotuły - Reconstruction And Change Of Use Of The Attic Of The School Building And Expansion With An External Passenger Elevator Shaft, • Reconstruction Of The External Wall And Part Of The Roof To The Extent Necessary To Install An External Elevator For Disabled People, • Construction Of Foundations For The Elevator Shaft, • Construction Of The Shaft Structure And Casing, • Construction Of The Pit And Upper Shaft In Accordance With The Technical Requirements Of The Elevator, • Reconstruction And Adaptation Of The Attic With Change Of Use, • Reconstruction Of Internal Walls, • Construction Of New Door Openings And Possible Bricking Up Of Existing Ones, • Reconstruction Of Floors (Including Raising The Level To Cover Structural Elements/Foundations), • Installation Of New Floor Layers, • Renovation And Finishing Of External Walls (Filling, Plastering, Painting, Possible Varnishing Or Impregnation), • Implementation Of Thermal And Moisture-Proof Insulation, • Reconstruction Of Sanitary Installations (Water And Sewage, Central Heating, Ventilation), Reconstruction Of Electrical Installations, • Installation Of Power Supply And Elevator Control, • Installation Of Basic And Emergency Lighting, • Installation Of Floors (E.G. Tiles, Carpets, Panels - According To The Design), • Installation Of Wall Coverings (E.G. Ceramic Tiles, Washable Paints), • Installation Of Suspended Ceilings, • Installation Of Doors And Windows, • Installation Of Permanent Equipment Elements, • Installation Of Furniture (E.G. Permanent Structures, Wardrobes, Equipment). Rooms).• Construction Of New External Stairs With A Roof. The Task Is Carried Out In Two Stages: Stage I - Development Of Design Documentation, - Obtaining All Decisions And Consents In Accordance With § 2 Section 1 Of The Draft Agreementstage Ii Implementation Of The Investment, Obtaining All Legally Required Consents And Permits Necessary For The Operation Of The Investment In Accordance With § 2 Section 2 Of The Draft Contract Note: The Contractor Must Take Into Account The Situation That The Types Of Works Specified In The Functional And Utility Program Are Indicative And May Change After The Development Of Design Documentation (Resulting From The Decisions, Opinions And Arrangements Obtained And The Design Solutions Used). Detailed Solutions Increasing The Scope Of Works Are The Contractors Risk And Will Not Be Treated As Additional Works. Before Preparing An Offer, It Is Recommended To Conduct A Local Inspection Of The Construction Site. In The Case Of A Site Visit, Please Contact The Contact Persons In Advance.2. The Detailed Description Of The Subject Of The Order Is: A) Draft Contract - Annex No. 7 To The Swz; B) Functional And Utility Program With Graphic Attachment - Annex No. 8 To The Swz; Moreover, The Subject Of The Order Should Be Implemented In Accordance
|