1. The Task Will Be Implemented In Accordance With The Previously Developed Design Documentation Entitled: Development Of The Area At The Public Primary School No. 5 With Integration Departments In Opole, Which Concerned The Earlier Stages Of The Investment Implementation.2. The Scope Of Work Includes: 1) Lawn At Stage 2: - Dismantling The Surface Of 145 M2 Of Concrete Tiles, - Dismantling The Aggregate Base 145 M2, - Transporting Demolition Materials To Pszok, - Placing A Concrete Palisade In A Circular Shape Next To The Remaining Sidewalk - Placing A Concrete Palisade In A Circular Manner Parallel To The Existing Palisade, Harmonizing With The Existing Architectural Elements, - Installing An Irrigation System Above The New Palisade And On Lawn Level - Connection To The Existing System - Fertilization Of Fertile Soil, Sowing Grass2) Flower Bed After The Swimming Pool: - Removal Of Concrete, - Removal Of Demolition Materials To Pszok, - Installation Of A Concrete Palisade Harmonizing With The Existing Architectural Elements 22.5 M, - Installation Of An Irrigation System, - Fertilization Of Fertile Soil, Sowing Grass3) Flower Beds: - Dismantling The Surface Of Concrete Tiles And Clinker Bricks 24.30 M2, - Dismantling The Aggregate Base, - Exporting Demolition Materials To Pszok, - Placing Concrete Edges 38.40 M, - Bringing In Fertile Soil On An Area Of 24.30 M2, Depth 0.2 M, - Sowing Grass. 4) Slope And Stairs: - Dismantling The Concrete Ramp And Stairs Next To The Ramp, - Dismantling The Base For The Ramp And Stairs, 25 Cm Deep, - Transporting The Demolition Materials To Pszok, - Placing Concrete Edges Around The Ramp And On The Edges Of The Steps, - Making The Base For The Surfaces, 25 Cm Deep, - Laying A Concrete Pavement On The Ramp And Steps Of The Stairs. 2000-5000 Lx. Match The Selected Fixture With The Column, Present The Fixture To The Investor For Approval At The Implementation Stage. 6) Replacement Of The Surface: - Dismantling The Surface Of The 130 M2 Trylinka Concrete Cubes, - Dismantling The Aggregate Subbase, Subbase Thickness 15 Cm, - Exporting Demolition Materials To Pszok, - Placing Concrete Edges, - Making The Substructure Under The Surfaces, Depth 15 Cm, - Laying The Surface With 8 Cm Concrete Cubes7) Lawn Irrigation Using Pop-Up Sprinklers, Irrigation Of Greenery/Lawns On Palisades Using Drainage Pipes. Pe Pressure Pipes Connected By Welding, Ø 16Pe Infiltration Pipes Above The New Palisade Set Parallel To The Existing Palisade. Installation Of Pop-Up Sprinklers To Water The Newly Created Lawn.3. The Detailed Scope Of Work Is Included In Annex No. 1 To The Swz - Description Of The Subject Of The Order, Graphic Annex No. 1, Bill Of Quantities.4. The Design Documentation Of The Entire Investment, Including The Current Stage And Previously Completed Stages, Together With Graphic Attachments And The Bill Of Quantities Are Attached To The Swz.5. The Contractor Is Obliged To Meet The Conditions Regarding The Employment Of Persons U
|