1.1. Construction Works Reconstruction Of The Sewage Pumping Station In Msc. Ski (Main P1), - Dismantling The Existing Sewage Pumping Station And Installation Of A New Network Pumping Station O2000mm - Dismantling The Ks200 Gravity Sewage Network On A Section With A Length Of L = 3.0 M - Dismantling The Ks160 Pressure Sewage Network On A Section With A Length Of L = 2.3 M - Construction Of A Gravity Sewage Network Made Of Pvc Pipes O250 Mm With A Total Length Of L = 2.5 M Along With Installation 1 Set 1500 Mm Reinforced Concrete Inspection Well With A Settling Tank (So) - Construction Of A Pressure Sewage Network Made Of Pe100 Sdr17 Pn10 O160 Mm Pipes, 5.1 M Long - Assembly Of The Designed Pumping Station Control Cabinet (Ss) - Construction Of A Yky 5X10 Mm2 Cable Line In Dvk50, Length L = 11.0 M (Ss Power Supply) - Dismantling The Existing Fence On 34.0 M Long Sections With A 3.5 M Wide Gate And Construction Of A New O5 Mm 3D Panel Fence With A Height Of H = 1.73 M On A 29.0 M Long Reinforced Concrete Plinth (Without A Gate And Wicket) Along With The Assembly Of 1 Set. A 1.0 M Wide Wicket With A Handle And A Lock And A 4.0 M Wide Bipartite Gate With A Hasp, Padlock And Legs, - Hardening The Area With Concrete Blocks Thick. 8.0Cm With An Area Of 49.9M2 (Concrete Curbs 15X22cm). 1.2. Construction Works Reconstruction Of The Sewage Pumping Station In Msc. Warchały P15 Disassembly Of The Existing Sewage Pumping Station And Installation Of A New Network Pumping Station O1500mm - Disassembly Of The Ks200 Gravity Sewage Network On A Section With A Length Of L = 2.4 M - Construction Of A Gravity Sewage Network Made Of Pvc Pipes O200 Mm With A Total Length Of L = 11.5 M Along With The Installation Of 2 Sets. Inspection Well O400mm And 1 Set Of Reinforced Concrete Well 1200Mm With Settling Tank (So) - Construction Of A Pressure Sewage Network Made Of Pe100 Sdr17 Pn10 O90mm Pipes, 5.8 M Long - Installation Of The Designed Pumping Station Control Cabinet (Ss) - Construction Of A Yky 5X6mm2 Cable Line In Dvk50, Length L = 8.7 M (Ss Power Supply) - Disassembly Of The Existing Fence In Sections 20.9 M Long With A 1.0 M Wide Gate And Construction Of A New O5 Mm 3D Panel Fence With A Height Of H = 1.73 M On A Reinforced Concrete Plinth 38.0 M Long (Without A Gate And Wicket) Along With The Assembly Of 1 Set. A 1.0 M Wide Wicket With A Handle And A Lock And A 4.0 M Wide Bipartite Gate With A Hasp, Padlock And Legs, - Hardening The Area With Concrete Blocks Thick. 8.0Cm With An Area Of 20.0M2 (Concrete Curbs 15X22cm).1.3. Construction Works Reconstruction Of The Sewage Pumping Station In Msc. Witowo P17 - Dismantling Of The Existing Sewage Pumping Station And Installation Of A New Network Pumping Station O1200mm - Dismantling Of The Ks200 Gravity Sewage Network On A Section With A Length Of L = 3.7 M - Dismantling Of The Ks63 Pressure Sewage Network On A Section With A Length Of L = 8.7 M - Construction Of A Gravity Sewage Network Made Of Pvc Pipes O200 Mm Wit
Contact Information
Address
Zakład Gospodarki Komunalnej Spółka Z Ograniczoną Odpowiedzialnością,Jedwabno,12-122,Warmińsko-Mazurskie,Pl622 - Olsztyński
Contact No.
531779221
Email
zgkjedwabno@gmail.com
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 115738409
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.