4.1. The Subject Of The Order Is The Modernization Of Roads In Nowy Olszowiec, Emilianów, Jasień, Olszowiec4.2. The Order Envisages The Implementation Of 3 Tasks: 4.2.1. Task No. 1 - Modernization Of Roads In Nowy Olszowiec, Emilianów, Jasień On Section No. 1 From Km 0 + 000.00 To Km 1 + 000.00. The Scope Of Construction Works Includes: • Reconstruction Of Existing Dirt Roadsides With Hardening Them With Mechanically Stabilized Road Reclaim • Reconstruction Of The Existing Bituminous Surface By Milling, Making A Leveling Layer Of Crushed Aggregates And A Layer Of Sand Stabilized With Cement 2.5 Mpa On The Reconstruction Of The Road Edge And The Reconstruction Of The Road Base And Surface• Laying The Wearing Course Of Ac,• Construction Of A New Culvert Under The Road• Desilting Of Roadside Ditches And Culverts Under Exits4.2.2 Task No. 2 - Modernization Of Roads In Nowy Olszowiec, Emilianów, Jasień On Section No. 1 From Km 1+000.00 To Km 2+018.67 The Scope Of Construction Works Includes: • Reconstruction Of Existing Dirt Roadsides And Hardening Them With Mechanically Stabilized Road Reclaim • Reconstruction Of The Existing Bituminous Surface By Milling, Making A Leveling Layer Of Crushed Aggregates And A Layer Of Cement-Stabilized Sand 2.5 Mpa On The Reconstruction Of The Road Edge And Reconstruction Of The Sub-Base And Road Surface • Laying A Wearing Course With Ac, • Desilting Of Roadside Ditches And Culverts Under Exits 4.2.3. Task No. 3 - Modernization Of The Road In Olszowiec. The Subject Of The Order Is The Modernization Of A Municipal Road With A Length Of 182.68 M. The Scope Of Construction Works Includes: • Reconstruction Of Existing Ground Roadsides And Hardening Them With Mechanically Stabilized Road Rubble • Reconstruction Of The Existing Surface Bituminous By Milling, Making A Leveling Layer And A Sub-Base Of Crushed Aggregates And A Layer Of Sand Stabilized With 2.5 Mpa Cement On The Reconstruction Of The Road Edge And The Reconstruction Of The Sub-Base, • Laying A Leveling (Profiling) And Abrasive Layer Of Ac, • Desilting The Existing Culvert Under The Road And Desilting The Ditch 4.3. A Detailed Description Of The Subject Of The Order Can Be Found In Annex No. 1 To The Swz. It Consists Of The Following Documents: 1) Construction Design (Text And Graphic Part), 2) Technical Specifications For The Execution And Acceptance Of Construction Works (Stwiorb), 3) Bill Of Quantities. Note: The Attached Design Documentation For Task No. 1 And 2 Covers A Wider Scope - The Subject Of The Order Is Section No. And Stwiorb. The Bill Of Quantities Is Of An Auxiliary Nature. The Occurrence Of Works Not Included In The Bill Of Quantities Or Of Works In Larger Quantities Than Those Accepted In The Bill Of Quantities During The Execution Of The Contract Will Not Entitle The Contractor To Demand Additional Remuneration - If These Works Were Included In The Design Documentation Or Stwiorb.
Contact Information
Address
Gmina Lubochnia,Lubochnia,97-217,Łódzkie,Pl713 - Piotrkowski
Email
gmina@lubochnia.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 115738363
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.