|
Preparation Of Multi-Discipline Documentation Based On The Architectural And Construction Concept. The Subject Of The Order Is The Development Of A Comprehensive Multi-Discipline Construction And Executive Design Together With A Bill Of Quantities, Investors Cost Estimate, Technical Specification For The Execution And Acceptance Of Construction Works Together With The Necessary Arrangements, Obtaining A Valid Building Permit According To Architectural Concept For The Construction Of Storage Rooms With The Possibility Of Parking Vehicles, Including Technical Facilities, Along With The Partial Renovation Of The Maneuvering Area At Ul. Wyki 3 In Krakow For The Needs Of Civil Protection And Civil Defense For The Task Called: Construction Of Storage Rooms With The Possibility Of Parking Vehicles, Including Technical Facilities, Along With The Partial Renovation Of The Maneuvering Area At Ul. Wyki 3 In Krakow For The Needs Of Civil Protection And Civil Defense. Address Investment: Dz. No. 311/21 As Above 0042 Rev. Krowodrza, Ul. Kazimierza Wyki 3, Kraków, Plot Id: 126102_9.0042.311/21 Investment Locationthe Designed Facility Is Located On Plots In Kraków - Plots No. 311/20, 311/13, 311/22 In Kraków, Precinct K-42 Krowodrza, City Of Kraków. The Designed Building Is Located In The Western Part Of The Area Being The Subject Of The Study. As Part Of The Investment In Question, It Is Also Planned To Reconstruct The Existing Underground Infrastructure Networks That Are In Conflict With The Designed Building. The Area Where The Investment Is Planned Is Located Within The Area Covered By The Local Spatial Development Plan Rejon Ulic Pachońskiego, Wyki, Łokietka, Imposing In Particular The Following Guidelines/Restrictions: • The Investment Area Is Located In The Area Marked As U.8• Share Of Biologically Active Surface Min. 30%. All Solutions Should Ensure Compliance With Legal Requirements, Local Law, Fire Protection Regulations, Evacuation And Safety Conditions, As Well As Hygienic And Sanitary Guidelines Adapted To Modern Formal And Legal Requirements. The Investment Is Planned To Include, Among Others: Tidying Up The Adjacent Area Directly Next To The Designed Facility By Hardening The Access And Access Road To The Building In Question, Creating A Biologically Active Part And Locating The Technical Infrastructure Necessary For The Operation Of The Facility. As Part Of The Task, The Designer Should: • Perform Detailed Planning And Functional Analyses, • Perform The Required Measurements And Tests Necessary To Develop Design Solutions (Detailed Inventory, Surveying, Geological Measurements), • Develop The Final Multi-Discipline Concept For The Development Of The Area And The Building, Based On Which - After Accepted By The Investor, Will Proceed To Further Design Work• Develop Multi-Discipline Design Documentation (Construction Design, Land Development Design, Architectural And Construction Design, Technical Design - In Order To Obtain A Building Permit, For
|