Energy Meters – K2648 Purchase Of Heat Consumption Meters And Their Parts. In The Service Area Of Bkm Nonprofit Zrt. Főtáv Division, In The Heat Centers Of Its Hot Water District Heating Systems, It Performs Accounting Heat Consumption Measurements In Accordance With Legal Regulations - Within The Framework Of Public Service Activities. The Heat Consumption Meter Must Also Be Suitable For Measuring Cooling Energy. In The Case Of Measurements With Legal Effect, Bkm Nonprofit Zrt. Is Obliged To Carry Out An Authentic Heat Consumption Measurement, And This Measurement Is The Basis Of Settlement With Users. In Order To Build And Maintain The Measuring Points, Bkm Nonprofit Zrt. Intends To Conduct A Public Procurement Procedure For The Procurement Of Heat Consumption Measuring Devices And Their Components. The Purpose Of The Listed Requirements Is To Ensure That The Subassemblies Of The Heat Consumption Measuring Devices To Be Delivered Comply With The Metrological Legislation, As Well As To Ensure That They Are Fully Integrated Into The Operation And Maintenance Processes Of The Contracting Authority For Heat Consumption Meters. The Contracting Authority Integrates The Heat Quantity Meters It Uses Into Its Existing Remote Reading System, Therefore, With Regard To The Meters To Be Delivered, It Is Expected That The Contracting Authority Can Fit Them Into Its Remote Reading Systems In Such A Way That It Does Not Have To Make Modifications, Changes Or Improvements To The Existing System Components. The Tenderer Wishes To Enter Into A Framework Sales Contract For The Procurement Of Heat Consumption Measuring Devices (Subunits) And Parts For A Period Of 24 Months Or Until The Total Amount Of Huf 68,400,000 + Vat Is Exhausted. The Tenderer Undertakes To Draw 70% Of The Total Amount. The Tenderer Is Not Obliged To Withdraw The Portion Exceeding 70% Of The Total Amount, The Contracting Party As The Winning Tenderer May Not Make Any Claims For Damages Or Other Claims Against The Tenderer In The Event That The Portion Exceeding 70% Of The Total Amount Is Not Used Up. Planned Quantity Of Heat Consumption Measuring Devices (Subunits) For 24 Months 840 Pieces As Follows: - Computing Unit - Equivalent To Multical 603, With Mbus Communication + 2 Pulse Inputs: 359 Pieces - Computing Unit Industrial Design - Equivalent To Multical 801: 3 Pieces - Sensors (Assorted In Pairs, Mid Certified) Ø 5.8 Mm: 426 Pieces - Ultrasonic Flowmeter With Threaded Connection Pn16, With Mid Certification: 25 Pieces - Ultrasonic Flowmeter With Flanged Connection Pn25, With Mid Certification: 27 Pieces The Quantity Of The Parts Of The Planned Heat Consumption Measuring Devices (Subassemblies) For 24 Months Is 1237 Pieces As Follows: - Basic Modules For Computing Unit: 59 Pieces - Submersible Sleeves Made Of Stainless Steel: 120 Pieces - Screws (Brass, With Dutch Sealing Ring, In Stock): 208 Pieces - Lithium Battery For Heat Consumption Meter Computing Unit: 850 Pieces Planned Amount Of Support For 24 Months As Follows: - Support (Optical Reading Head Required For Programming And Reading Meters Together With The Reading Software 2 Pcs; Programming Support Labor Fee 12 Hours; Programming Support Disembarkation Fee 3 Times) Subject Of This Public Procurement Procedure From The Parts Recovering
Contact Information
Address
Kalotaszeg Utca 31
Contact No.
+36 302778274
Email
tothgyo@budapestikozmuvek.hu
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 115634888
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.