Construction Work – Expansion Of The Psychological And Pedagogical Counseling Center Located In The Building At Ul. Spindle 24. 1. Scope Of The Order Before Starting Demolition And Dismantling Works, Fully Secure The Work Area Against Access By Unauthorized Persons And Secure It. The Protection Includes The Installation Of Fencing And Information Boards In The Area Of Works Being Carried Out. The Subject Of The Order Is The Performance Of Complete Construction And Assembly Works In The Scope Of: 1) Demolition And Preparatory Works A) In The Field Of Façade/External Works: - Assembly Of Scaffolding, - Dismantling Of The Lightning Protection System; - Disassembly Of Outdoor Lighting Fixtures; - Dismantling Of Gutters And Downspouts; - Dismantling Of Basement Window Grates; - Dismantling Of The Ramp; - Dismantling Of External Stair Railings; - Dismantling Canopies Over All Entrances To The Building; - Disassembly Of Stairs To The Kitchen Block - Dismantling Of The Coal Chute - Dismantling And Securing For The Duration Of Renovation The Elements On The Facade, E.G. Signs, Boards, Etc., Reassembly With Elevation To A New Layer Of Insulation - Dismantling Of Air Conditioners Along With Installations - Dismantling Of Sheet Metal Flashings: External Window Sills, Roof Flashings, Attic Wall Flashings And Cornice - Dismantling Of Pipes Ventilation - Breaking Down Plasters And Cladding - Dismantling Layers Of Insulation - Dismantling Window And Door Frames And The Roof Hatch - Dismantling The Building Architrave - Excavating Foundation Walls - Dismantling Ventilation Grilles On The Facade - Removing The Existing Insulating Layer Of The Flat Roof B) In The Scope Of Internal Works: - Dismantling Of Equipment, Left Behind Equipment, Furniture, Buildings, Joinery Until The Rooms Are Completely Empty. Cleaning Includes Loading, Removal And Disposal Of All Rooms Of The Building: Basements, Rooms. Common Areas, Offices, Rooms And Other Rooms; - Dismantling Of Radiators, Devices And All Installations; - Dismantling Suspended Ceilings; - Dismantling Of Existing Joinery; - Dismantling Of Partition Walls; - Dismantling Existing Floors Down To The Load-Bearing Subgrade Layer; 2) Construction Works A) In The Field Of Facade/External Works: - Bricking Up The Openings Specified In The Drawing Part; - Enlargement Of The Hole In Accordance With The Drawing Part; - Insulation Of External Walls - Execution Of Mineral Plasters Painted With Silicone Paint Or Cladding In Accordance With The Facade Design; - Insulation Of The Plinth And Foundation Walls - Protection Of Foundation Walls With Dimpled Foil; - Construction Of Plinth Cladding; - Insulation Of The Flat Roof Space - Renovation Of The Existing Roofing Made Of Felt Felt, Renovation Of Chimneys; - Horizontal Insulation Of Foundation Walls - Injections - Horizontal Diaphragm With Low Viscosity Materials; - Vertical Insulation Of Foundation Walls; - Floor Insulation - Slurry Insulation Under Floor Layers; - Installation Of New Sheet Metal Flashings: External Window Sills, Roof Flashings, Parapet Wall Flashings And Cornice; - Installation Of New Gutters And Downspouts; - Installation Of New Windows And Doors And Smoke Vents; - Slope Renovation
Contact Information
Contact No.
+48224434817
Email
bielany.zamowienia@um.warszawa.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 115634866
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.