Audio-Visual Equipment – Arrangement And Construction Of Tourist Routes In The Basement Of The Queen Luiza Adit.. Name Of The Order: Arrangement And Construction Of Tourist Routes In The Basement Of The Queen Luiza Adit Basic Information: The Order Concerns The Arrangement And Implementation Of Tourist Routes In The Basement Of The Queen Luiza Adit. Two Tourist Routes Are Planned To Be Put Into Operation Within One Complex Of Underground Workings. The Element-Themed Route Will Be Entirely Made More Attractive And Modernized, While The Historical Route Will Be A New Product. As Part Of The Order, The Contractor Is Obliged To Complete Two Complete Tourist Routes, Which Include Arrangement Elements (Scenography, Buildings, Etc.), Av Equipment, Lighting, Multimedia Content, Multimedia Installations And Ethernet Networks. Descriptions Of The Subject Of The Order Are Included In 3 Design Documents: 1. Concept And Design Of A New Underground Exhibition Dedicated To The Elements, Created On The Basis Of Tourist Routes In The Queen Luiza Adit, Along With Annexes. Note: Annex No. 2 To The Concept And Design Contains An Update Of The Specification Of Minimum Technical Parameters - It Replaces The Content Of Project Pages 33-46. 2. Concept And Design Of A New Underground Historical Exhibition Based On Tourist Routes In The Queen Luiza Adit. Note: Annex No. 2 To The Concept And Design Contains An Update Of The Specifications Of Minimum Technical Parameters - It Replaces The Content Of Project Pages 41-46, Regarding The Specifications Of Minimum Parameters. 3. Design Of The Installation As Part Of The Newly Designed Tourist Routes Located In The Queen Luiza Adit In The Coal Mining Museum In Zabrze. The Scope Of This Task Does Not Include: Ad.1.1. Site 15 Embankment Is Excluded From The Procedure. Ad.1.2 The Development Of Content For Sites 17 And 18 Is Excluded From The Procedure. The Complete Musical Piece Will Be Transferred To The Sites After Signing The Contract With The Contractor. Ad.2.1 From Stand 5 Tape Ride - The Radio Station Is Shut Down Transport Device Ad.2.2 Stand 23 In The Queue Karlik (Content) Is Excluded From The Proceedings Both Stand 15 Embankment And The Delivery And Assembly Of The Transport Device Will Be Covered By Separate Proceedings. Location The Subject Of The Order Will Be Carried Out In The Underground Workings Of The Queen Luiza Adit, I.E. The Historical Buildings Of The Main Key Heritage Adit And The Queen Luiza Mine In Zabrze. Entrance To The Workings From The Street. Wolności 410, Mochnackiego 12, K. Miarki 8 (Access From The Waterway). The Workings Are Located At A Depth Of 0 To -40 Meters. Atmospheric Conditions In The Workings May Vary Slightly: 1. Workings Of The Królowa Luiza Mine At Ul. Mochnackiego 12 A. High Dustiness B. Temperature Ranging From 11°C To 16°C C. Air Humidity Ranging From 77% To 2. Excavations Of The Main Key Heritage Adit A. Temperature Ranging From 10°C To 18°C B. Air Humidity Ranging From 84% To 84% D
Contact Information
Contact No.
326303091
Email
zamowienia@muzeumgornictwa.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 115634494
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.