|
Construction Work – Federal Ministry For The Environment, Climate Protection, Nature Conservation And Nuclear Safety - Extension Construction - Low Current - Award 1348/2026. Low Current Din 18382 Kke 405.1 Further Description Of The Service: - Equipment Security Center / Control Center Tables With Control Center Tables (4 Pieces), Furniture, Monitor Wall With 55 Displays (4 Pieces) And 24 Monitors. - Ot Security Network With Poe Switches (Approx. 33 Pieces), Fiber Optic Switches (Approx. 3 Pieces) And Management Switch (1 Piece). - Passive Data Networks With Floor Distributors (Approx. 124 Units), Server Racks (Approx. 94 Units), Small It Distribution Boards (Approx. 103 Units), Rj45 Data Sockets (Approx. 5,600 Units), Cables (Approx. 22,000 Units) And Fiber Optic Fibers For Splicing (Approx. 9,000 Units). - Cables And Lines For Low-Voltage Systems With Installation Cables/Telecommunications Lines (Approx. 104 Km), Fire Alarm Cables (Approx. 67 Km), Loudspeaker And Hearing Loop Cables (Approx. 6 Km), Copper Data Cables (Approx. 280 Km), Fiber Optic Cables (Approx. 30 Km), Copper Patch Cables (Approx. 2,880 Pieces) And Fiber Optic Patch Cables (Approx. 340 Pieces). - Installation Material And Laying Systems With Drilling In Reinforced Concrete (Approx. 520 Pieces), Slotting Work (Approx. 300 M), Device Boxes (Approx. 6,500 Units), Profile Rails (Approx. 700 M), Electrical Installation Pipes (Approx. 5,000 M), Electrical Installation Ducts (Approx. 2,000 M) And Cable Protection Pipes For Outdoor Systems (Approx. 5,000 M). - Fire Protection Measures With Fire Barriers For Wall And Ceiling Ducts (Approx. 620 Pieces). - Surge Protection With Surge Arresters For Data Technology (Approx. 50 Pieces) And Telecommunications Technology (Approx. 20 Units). - Cross-System Services For The Coordination, Integration And Coordination Of Telecommunications Systems Including The Creation Of A Functional Specification. - Documentation With Execution And Operating Documents In Accordance With Bbr Specifications As Well As Preparatory Work For The Sustainable Building Assessment System (Bnb). - Commissioning Management (Including Black Building, Comfort, K-Fall Test) - Maintenance Services Are Part Of The Tender Note - Bnb Certification A Bnb Certification In Gold And A Bnb Certification In Silver For The Outdoor Facilities Are Sought For The Building. The Contractor Must Contribute To The Successful Certification. The Contractor Must Comply With The Relevant Requirements Regarding Low Waste, Low Noise, Low Dust Levels And The Requirements Of The Federal Soil Protection And Contaminated Site Ordinance During Construction. Furthermore, The Requirements Listed In Appendix 01 “Material Requirements” Apply At Quality Level 5. The Contractor Must Declare All Materials, Products, By-Products And Auxiliary Products As Well As Components Intended For Use With Regard To Their Ingredients And Properties. For This Purpose, Appendix 02 “Declaration Tables” Must Be Filled Out In Digital Form (Excel File Format) And The Associated Technical Data Sheets And Safety Data Sheets In Accordance With 1907/2006/Ec (Also In Digital Form) Must Be Assigned And Enclosed. Dates: Implementation Deadlines: Start: No Later Than 12 Working Days After Receipt Of The Order Letter End: November 30, 2029
|