General Construction Work For Pipelines – Connection Wv Fr West To Geothermal Energy Wv Tel-Aviv-Yafo. The District Heating Pipeline Along Tel-Aviv-Yafo-Allee Is Crucial For Connecting The Freiburg West Heating Network To The Future Geothermal Heat Supply. In This Construction Phase, The Existing District Heating Pipeline From The Intersection Of Tel-Aviv-Yafo-Allee / Adelheit-Steinmann-Straße Will Be Continued. The District Heating Pipeline Runs Along Tel-Aviv-Yafo-Allee To Opfinger Straße. In The Area Of The Vag Premises, The District Heating Pipe Bends Onto The Vag Premises And Ends In The Area Of The Access To The Vag On Opfinger Straße. A Total Of 730 M Of District Heating Pipe Must Be Built As A Single Pipe. The Main Part Of The Pipeline Is Made Of Dn300 As A Single Plastic Jacket Pipe (Kmr). The Majority Of The Pipeline Is Manufactured Using Insulation Series 3. The Nordic Leak Warning System Is Used. The Branch To The Vag Is Made Of Kmr Dn200. There Is Also A Branch Below Adelheit-Steinmann-Straße In Kmr Dn250 To Connect The Existing District Heating Pipe In The Direction Of Rieselfeld. Underground Fittings (Ball Valves, Vents, Cable Outlets) Must Be Provided Along The Route. An Empty Pipe Package Made Of Triple Dn50 Is Also Installed In A Composite Or As An Individual Pipe Package For The District Heating Pipeline. The District Heating Pipe Is Laid Both In The Street And In Unpaved Terrain. The Condition Of The Surface Must Be Restored Here After The District Heating Pipe Has Been Laid. Along The Tel-Aviv-Yafo Avenue There Is A Dilapidated Ditch To Cross As Well As Two Smaller Canals And The Main Sewage Collector In Dn3040. Depending On The Construction Phase, The District Heating Must Be Embedded In Sand Or Liquid Soil. It Should Be Noted That Several Columns Should Work In Parallel Or Staggered One Behind The Other. A Pressure Drilling Method Is To Be Used To Cross The Tram Tracks In The Opfinger Straße Area. Here Two Dn600 Protective Tubes Are Pressed In, Each Of Which Has A Kmr Dn300 Inserted Into It. The Pressing Has A Length Of Approx. 21 M. A Start And A Target Pit Must Be Created And The Pressing Holes Must Be Drilled. All Other Crossings Will Be Carried Out Using An Open Construction Method. The Traffic Regulations Must Be Implemented. All Technical And Legal Standards And Regulations Must Be Adhered To As Part Of The Construction Project.
Contact Information
Address
Tullastrasse 61
Contact No.
07612793702
Email
doreen.scholtholt@badenovanetze.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 115526177
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.