Architectural And Related Services – City Of Eichstätt New Construction Of The Fire Station. The Large District Town Of Eichstätt Is Planning To Build A New Fire Station For The Eichstätt Volunteer Fire Department At The “Freiwasser” Location As A Replacement For The Previous Location On Residenzplatz. Several Locations Were Examined And Evaluated As Part Of A Feasibility Study. The “Open Water” Location Was Identified As A Preferred Location Due To The Size Of The Property, The Expansion Options And The Better Functional Organization Of The Alarm And Operational Processes. The Measure Includes The Construction Of A New Fire Station With A Vehicle Hall, Operational And Changing Areas, Training And Administration Areas, Workshops, Storage Areas, Respiratory Protection Workshop, Washing Hall, Technical Areas And Outdoor Facilities With An Alarm Yard, Exercise Yard And Parking Spaces. The Spatial Program Updated As Part Of The Feasibility Study Provides For A Usable Area Of Under 1,700 M² Or A Gross Floor Area Of Approx. 2,170 M². In Addition To The Spatial Program Drawn Up For The Feasibility Study, Further Requests For Changes Arise From Inspections Of Other Houses, Which Must Be Checked, Validated Together With The User And Building Owner Before Concrete Planning Begins And, If Necessary, Incorporated Into The Basic Spatial Program. A Functional And Economical New Building With A Predominantly Robust And Sustainable Low-Tech Approach Is Planned. Compact Building Structures, Long-Lasting Materials And Low-Maintenance Building Operation Are Planned. Special Requirements Arise From Its Use As Critical Infrastructure, Particularly With Regard To Flood Protection, Emergency Power Supply, Operational Safety And Fire Department-Specific Functional Processes. Due To Its Striking Urban Location Directly On The B13, Special Requirements Are Placed On The Architectural Quality And Integration Into The Town And Landscape. Although The Location Is Outside The Listed Ensemble, There Is A Direct Visual Connection To Willibaldsburg, Which Must Be Appropriately Taken Into Account In The Design. Together With The Property Planning Service, The Measurement Of The Building Site At The Start Of Planning As Well As The Fire Protection Planning Are Also Awarded. The Cost Of The Measure Is Currently Estimated At Around €9.9 Million Gross. This Cost Framework Should Be Adhered To. Planned Project Sequence (Provisional): • Start Of Planning: Fourth Quarter Of 2026 • Submission Of Building Application: Second Quarter Of 2027 • Tender For Construction Services: From Fourth Quarter Of 2027 • Expected Start Of Construction: First Quarter Of 2028 • Expected Completion/Commissioning: Beginning/Mid-2030 The Building Object Planning Services In Accordance With Section 34 Hoai Will Be Awarded In Stages. The Commission Is Made For Service Phases 1-9, Then Optionally In Stages For The Further Service Phases. There Is No Entitlement To Commission Further Stages. Likewise, The Planning Services For Fire Protection Planning In Accordance With The Service Profile Document 17 Aho Will Be Transferred Gradually
Contact Information
Address
Marktplatz 11
Contact No.
0842160010
Email
poststelle@eichstaett.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 115524764
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.