The Municipality Of Sodankylä Requests Your Contract Offer Based On Unit Prices For The Annual Maintenance Of The Road And Track Lighting Owned By The Municipality Of Sodankylä: The Sites Are Partly Located In The Side Villages Of Our Large Municipality, But The Main Focus Of The Contract Is In The Church Village And Luosto. In The Work, Broken Lamps Are Mapped And Replaced And The Functionality Of The Lighting Is Ensured. The Subscriber Reports The Defective Lamps Known To Him. The Street Network Has Lighting For About 70 Km (1800 Pieces). On The Rest Of The Road, There Is Lighting Owned By The Municipality For About 46 Km (Approx. 900 Pieces). There Is Track Lighting For About 33 Km (760 Pieces). There Are A Total Of 3,200 Lamps. Possible Oxime And Ground Cable Faults Are Repaired At An Hourly Rate. The Contractor Is Responsible For Procuring Replacement Bulbs Or Replacement Lamps. In Addition To The Cost Price Of The Material Used, The Customer Pays A Maximum Of 8% Margin. The Street And Road-Specific Quantity List Is Attached. The Table Shows The Types Of Lighting Used. Central Destination Maps That Give Direction Can Be Obtained By Separate Request. For Luostos Street Lighting And Track Lighting, The Municipality Uses Interact City. However, Not All Defects Can Be Detected Through It. The Contractor Informs The Customer Of Other Needs He Detects, Such As The Need To Straighten Or Replace Poles Implementation Of Road And Street Lighting By September 6, 2026. The Maintenance Of The Track Lighting Must Be Completed By 30 September 2026. The Construction Work Complies With The Laws And Regulations In Force In Finland, Official Standards And Generally Used Standards In The Field. The General Technical Requirements Of The Project And Proof Of Eligibility Are Presented In Rakennustieto Oys Publication Infra Ryl 2022 General Quality Requirements For Infrastructure Construction. Particular Attention Should Be Paid To Infraryl 2025/2: 33000 Electrical, Telecommunication And Mechanical Systems. The Person Responsible For The Operation Has An Electrical Education Suitable For The Field And At Least Two (2) Years Of Work Experience In The Field. The Operator Must Be Registered By Tukes And Have At Least An S2 Electrical Qualification Or Equivalent Rights (E.G. A Or A(Sj) Rights). The Price Must Include All Costs Required For The Finished Work. Getting To Know The Destinations On Site Is Not Required During The Bidding Phase. The Customer Reserves The Right To Suspend The Purchase Or Limit The Scope Of The Contract In Relation To The Available Funds.
Contact Information
Contact Person
Sodankylän Kunta
Address
Jäämerentie 1 Pl60
Email
kirjaamo@sodankyla.fi
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 115454024
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.