1. The Subject Of The Tender Is The Selection Of A Contractor Who Will Perform Construction Works For The Ordering Party, Including The Turnkey Construction Of A Workshop Building For The Construction School Complex In Zakopane Along With The Accompanying Technical Infrastructure And Construction Equipment, Demolition Of The Farm Building And A Gazebo, And The Construction Of A New Gazebo. As Part Of The Investment, The Following Should Be Constructed: A New Workshop Building With Connections, Sanitary And Rainwater Sewage Systems, Water Supply Installations, Reconstruction Of The Telecommunications Network, Hardened Surfaces And Demolition Of The Farm Building And Gazebo, A New Gazebo And Preparation Of Complete Documentation To Submit A Notification To The Construction Supervision Authority On The Completion Of Construction In Order To Obtain A Decision On The Occupancy Permit.2. A Detailed Description Of The Subject Of The Order Is Specified In The Multi-Discipline Detailed Design Prepared For The Task In Question, Constituting Annex No. 7 To The Swz, And The Technical Specification For The Execution And Acceptance Of Construction Works, Hereinafter Referred To As Stwiorb, Constituting Annex No. 8 To The Swz. Moreover, The Ordering Party Stipulates That After Completing The Works Specified Above, The Contractor Is Obliged To: 1) Prepare As-Built Documentation In The Form Of A Brochure Of The Inspection Report Referred To In Art. 57 Of The Construction Law, Including Surveying Inventory.3. Based On The Table Of Settlement Stages (Ter), Which Is Part Of The Offer Form - Annex No. 1 To This Swz, The Following Stages Of Work Implementation Are Established: Stage I: The Minimum Scope Of Works Subject To Settlement Under Stage I Consists In The Performance Of All Preparatory Works Related To The Organization Of Construction Works And The Performance Of Construction Works On The Shell Of The Closed Building, Including, Among Others - Development Of The Construction Site; - Demolition Works: Of The Farm Building And The Gazebo; - Cutting Down Trees Colliding With The Investment And Removing Wood To The Place Indicated By The Investor; - Earthworks, Including, Among Others: Securing The Walls Of The Excavation; - Ground Level Works, Development Of The Area, Including Connections; - Open Shell Works (Building Structure), Including, Among Others: Internal And External Walls, Ceilings, Internal Stairs, Columns, Beams, Roof Structure And Covering; - External And Internal Carpentry, Insulation Works And Facade Finishing Stage Ii: The Minimum Scope Of Works Subject To Settlement Under Stage Ii Consists Of Construction Works Including: - Installation Works: Hot And Cold Water Supply, Central Heating, Technological Heat, Sewage, Hydrant Installation And Boiler Room; - Works Installation, Including: Mechanical Ventilation Installation, Electrical Installation And Lighting, Low-Voltage Installations, External Area Lighting Installation, Telecommunications Instal
|