|
1. Name Of The Order Construction Of The Family Support Center At Ul. Jagiellońska In Kluczbork, Ii Procedure.2. The Order Includes The Design And Execution Of Works Involving The Construction Of A Family Support Center Building In Kluczbork Along With The Accompanying Technical Infrastructure. The Ordering Party Described The Subject Of The Order Using The Functional And Utility Program (Ffu), Which Is An Integral Part Of This Tor. The Order Includes The Design And Execution Of Works: 1) Development Of The Plot: A) Construction Of Installation Connections, B) Construction Of Sidewalks And Terraces For Pedestrian Traffic, C) Construction Of A Gravel Band Around The Building, D) Location Of A Place For Collecting Solid Waste, With Waste Segregation, E) Planting Of Low And High Greenery, F) Construction Of A Lawn, G) Construction Of A Retention Tank For Rainwater Used For Subsequent Watering Green Areas. 2) Construction Of The Building: A) Construction Of Foundations, External And Internal Load-Bearing Walls And Partitions, Floors On The Ground, Roof Structure, Installation Of Windows And Doors And Electrically Controlled External Roller Shutters B) Construction Of Internal Water And Sewage Installations, Including Fittings; Heating, Air Conditioning, Electrical, Telecommunications And Photovoltaic With Energy Storage, C) Finishing Works: Roof Covering, Thermal, Moisture-Proof, Water-Proof And Acoustic Insulation Of Walls, Floor On The Ground And Roof; Internal And External Plasters, External And Internal Wall Cladding, Floor Cladding, Painting.3. The Contractor Is Obliged To Prepare All Necessary Design Studies Together With The Necessary Opinions, Arrangements And Technical Conditions, Obtain On Behalf Of And On Behalf Of The Ordering Party All Arrangements, Permits, Approvals And Decisions Necessary To Perform The Subject Of The Order In Accordance With The Requirements Of The Ordering Party And The Terms Of The Contract, As Well As Perform Construction Works And Obtain, On Behalf And On Behalf Of The Ordering Party, The Required Documents Enabling Commencement Of Use And Obtain, On Behalf And On Behalf Of The Ordering Party, Permits For Use. 4. The Subject Of The Order Includes: 1) Development Of Complete Design Documentation In Accordance With The Regulation Of The Minister Of Development And Technology Of December 20, 2021 On The Detailed Scope And Form Of Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works And The Functional And Utility Program (Journal Of Laws 2021, Item 2454) In Accordance With The Scope, Including In Particular: A) A Map For Design Purposes (The Ordering Party Will Provide Contractor), B) Geotechnical Research Of The Ground (The Ordering Party Will Provide It To The Contractor), C) Construction Design Prepared In Accordance With The Regulation Of The Minister Of Development On The Detailed Scope And Form Of The Construction Design (Journal Of Laws 2022.1679, I.E. Of 2022/0
|