|
1. The Subject Of The Order Is The Performance Of Design And Cost Estimate Works As Well As Construction And Assembly Works In The Design And Build Formula As Part Of The Task Entitled: Rationalization Of Energy Consumption Through Thermal Modernization And The Use Of Renewable Energy Sources In A Public Building In Brodne Józefów 13, 99-412 Kiernozia.2. Address And Location Of The Subject Of The Order: Town: Brodne Józefówdz. Registry Number: 64 Registry District 0001 Brodne Józefów Commune: Kiernoziawoj. Łódź Voivodeship, Poviat: Łowicz3. The Scope Of The Subject Of The Order Includes: 1) Development Of Design And Cost Estimate Documentation Specified In The Functional And Utility Program (Hereinafter Referred To As Ffu) Constituting Annex No. 9 To The Swz And In The Building Energy Audit Constituting Annex No. 10 To The Swz, Along With Obtaining, Among Others: - Legally Required Decisions, Opinions, Arrangements For The Planned Project, - On Behalf Of The Ordering Party, The Final Decision On The Building Permit Or Making An Effective Notification Of Works Constructiondesign Documentation Must Be Developed: - Taking Into Account The Requirements Regarding Accessibility For Disabled People Or Design For All Users, - Taking Into Account Accessibility Conditions, So That People With Disabilities Can Use The Services Provided On An Equal Basis With Other Users, - In Such A Way That The Facilities Are Adapted For All Social Groups, Regardless Of Their Race, Gender, Beliefs, In Accordance With The Principle Of Non-Discrimination And In A Way That Guarantees Equal Opportunities For All Interested Entities And Natural Persons, - In Accordance With The Principles Universal Design2) Preparation Of The Area For The Investment,3) Performance Of Construction And Assembly Works Based On The Design Documentation Prepared In Accordance With The Pfu And The Energy Audit Of The Building, Including: A) Thermal Renovation Of Walls And Vertical Insulation Of Foundation Walls, B) Roof Insulation, C) Repair, Insulation And Re-Brickwork Of Chimneys, D) Replacement Of Sheet Metal Flashings, E) Replenishing The Wall Plasters And Repainting Them, F) Replacement Of Doors And Windows, G) Reconstruction Of The Toilet With Equipment, H) Reconstruction Of The Room On The Ground Floor, I) Reconstruction Of Floors On The Ground. J) Reconstruction Of Floors On The Ceiling, K) Painting Of Internal Walls And Ceilings, L) Finishing Works, M) Reconstruction Of The Central Heating Installation For A Ground Heat Pump, N) Reconstruction Of The Water Installation. - Kan., O) Reconstruction Of The Electrical Installation, P) Installation Of A Photovoltaic Installation With An Energy Storage Facility, Q) Purchase And Assembly Of The Building Energy Management System Installation 4) Performing Authors Supervision Over The Entire Task, 5) Preparation Of As-Built Documentation, Including The Development Of An As-Built Geodetic Inventory, 6) Reporting On Behalf Of The Ordering Party Of The C
|