1. The Subject Of The Order Is The Construction Project Entitled: Expansion And Reconstruction Of The Administrative Building Of The Cybinka Forest District - Continuation - 3Rd Procedure.2. The Scope Of The Order Includes: 1) Extension Of The Existing Administration Building - The Extension In Question Was Designed On A Rectangular Plan Facing South-West, Two-Story Without A Basement And Topped With A Flat Roof. Access To The Newly Designed Part Is Planned Using The Internal Communication Of Part Of The Existing Building. The Designed Extension Refers To The Existing Architectural Form Of The Building, In Particular In Terms Of The Height Of The Building, Floor Levels, Sizes Of Window Openings, The Height Of The Window Lines And The Foundation Level Of The Facility. Additionally, In The Part Of The Planned Expansion It Is Planned To Use Finishing Materials Compatible With The Materials In The Existing Part Of The Facility, Such As: - The Colors And Painting Pattern Of The Facade Are Consistent With The Painting In The Existing Part - Vertical Stripes Of Alternating Light Green And Green. Plinth – Gray Resin Plaster. The Color And Shade Of Painting Should Be Adjusted Using Color Samples On The Existing Part. - Wooden Window Joinery. Pattern And Shade Consistent With The Existing Part. - Designed Architectural Form With The Use Of Finishing Materials Consistent With The Existing Condition, 2) Reconstruction In The Existing Part - Additional Rooms Are Designed, Such As Utility Rooms, Social Rooms, Toilet, Communication And Additional Office Rooms.3) Land Development: - The Existing Landform Is Planned To Be Preserved. The Area Left As Shown In The Graphic Design After The Area Has Been Cleared Of Dirt Caused By Other Works Will Be Sown With Grass On A Previously Prepared Vegetation Substrate With A Minimum Thickness Of 10 Cm. It Is Recommended To Use A Ready-Made Mixture Of Seeds From Various Grass Species (3-4 Species), Creating A Uniform And Compact Green Surface. Shrub And Tree Seedlings Used For Planting Should Have A Properly Developed Root System. - Due To The Conflict Between The Planned Expansion And Existing Underground Networks, Their Relocation Is Planned. The Construction Facilities Subject To Reconstruction Include The Sanitary Sewage, Water Supply, Electricity And Telecommunications Networks. Additionally, In The Area Covered By The Study, Construction Equipment Related To The Building Is Being Designed, Ensuring The Possibility Of Using The Facility In Accordance With Its Intended Purpose, Such As A Storm Sewage System With A Septic Tank For Rainwater.4) Obtaining On Behalf Of The Ordering Party All Arrangements And Decisions As Well As An Occupancy Permit In Accordance With The Building Permit Decision.5) A Detailed Description Of The Subject Of The Order Is Described In Annex No. 12 - Description Of The Subject Of The Order (Opz).
Contact Information
Address
Lasy Państwowe Nadleśnictwo Cybinka,Cybinka,69-108,Lubuskie,Pl431 - Gorzowski
Contact No.
+48683911307
Email
cybinka@zielonagora.lasy.gov.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 115317344
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.