|
1. The Subject Of The Order Is The Performance Of Comprehensive Construction Works, Including The Construction Of An Amphitheater In Sieradz Along With Land Development On Part Of The Plot No. 245/10, Geodetic District 3 Sieradz City. 2. The Material Scope Of The Order Includes In Particular: A) Demolition Of The Existing Amphitheater, Including: - Demolition Of The Existing Amphitheater Building Together With The Stage Roof, - Dismantling Of The Audience Seats, - Dismantling Of The Auditorium Roof And The Steel Structure Of The Roof, - Dismantling Of The Auditorium Support Slab, B) Construction Of The Amphitheater, Including: - Construction Of A New Auditorium With Seats For 1,514 People, A Proscenium And A Stage Covered From Above By A Common Roof, - Construction Of Facilities For Artists Under The Stage Surface, - Construction Of A Toilet For Spectators Under The Audience Canopy, - Construction Of A Directors Station In The Center Of The Audience, - Acoustic Protection Of The Roof, - Execution Of Finishing Works - Finishing Of Facades, Interior Finishing, Floors, Walls, Ceilings, Joinery And Joinery, White Assembly And Fittings, - The Following Installations Are Planned In The Amphitheater: Domestic Hot Water Installation And Circulation Powered By A Ground Pump Heat, Cold Water Installations, Sanitary Sewage, Rainwater And Hydrant Installations, Heating Installations Powered By A Ground Heat Pump, Electrical Installations Including Lightning Protection, Telephone, Monitoring, Internet, Mechanical Ventilation, Ground Heat Pump. Characteristic Data Of The Facility Under Construction: - Building Area: 4,473.00 M², - Total Area: 1,834.50 M², - Net Area: 2,187.50 M², Including Net Area Of Cubature Rooms: 572.78 M², - Usable Area: 2,050.50 M², - Volume Of The Facility: 18,000 M³, - Building Height: 16.00 M, - Number Of Seats In The Auditorium: 1,514, - Facility Category - V.C) Land Development, Including: - Cutting Down Trees, - Hardened Surfaces, - Access To The Amphitheater, Parking Spaces, - Amphitheater Fencing, - Small Architecture, - Waste Storage Area, - Construction Of New Plantings, D) Execution As Part Of The Accompanying Infrastructure, In Particular: - External Water Supply Installation With A Connection, - External Sanitary Sewage Installation With The Reconstruction Of The Connection, - External Rainwater Drainage Installation, - External Electrical Installation And Internal Power Line, - External Telecommunications Installation With Connection, - Installation Of A Lower Heat Source, E) Construction And Installation Of An Information Board, F) Purchase And Installation Of Equipment - Furniture, Sound Equipment, G) Adaptation Of The Facility To The Needs Of People With Special Needs, Including In Particular The Purchase Of An Induction Loop With The Necessary Software, H) Purchase, Delivery And Installation Of Signs For People With Visual Disabilities Using Large And Contrasting Signs, Markings In Braille: - Information And Door Signs
|