|
1. Foreword Order Is The Construction Of The Orlik 2025 Sports Complex Along With The Construction Of A Circular Track And A Straight Track At The Secondary School Complex No. 2 In Jarocin.2. Foreword Order Includes In Particular The Construction Of: - A Football Pitch With Dimensions 30 M × 62 M And A Synthetic Grass Surface, - Multi-Purpose Pitch With Dimensions 19 M × 32 M And A Polyurethane Surface, - Fencing With Ball Catches, Lighting And Monitoring, - A 4-Lane Circular Track, 250 M Long, With A 4-Lane Straight Track For Runs Over A Distance Of 100 M And A Polyurethane Surface, - Storm Water Drainage, Retention Reservoirs And Development. Area.3. Foreword In Detail Order Specify: 1) Architectural And Building Design, Constituting Annex No. 10 To Swz,2) Technical Design. (Electrical, Construction And Sanitary Industries) And Technical Design. – Revision No. 1, Constituting App. No. 11.1 To Swz And Attachment. No. 11.2 To Swz,3) Development Plan. Area (Pzt), Constituting The Annex No. 12 To Swz,4) Spec. Tech. Execution And Acceptance Of Works (Stwior), Status. Regret. No. 13 To Swz, 5) Bill Of Quantities, Constituting Annex. No. 14 To Swz.4. Foreword Order Will Be Performed As Part Of The Task. Investment Mon. Construction Of The Orlik 2025 Sports Complex Along With The Construction Of A Circular Track And A Straight Track At The Secondary School Complex No. 2 In Jarocin.5. Foreword Order Is Co-Financed By The Frkf As Part Of The Orlik Sports Complex Construction Program - Edition 2025 And By The Pow. Jarocin.6. Foreword Order Includes The Construction Of Two Playing Fields And A Running Track With A Straight Running Track, A Retention Reservoir And Infras. Accompanying.Ex. Obligation Is In Particular To: 1) Execution Of The Foreword Order In Accordance With The Principles Of Technical Knowledge, Technical And Construction Regulations, Polish Standards And Other Relevant Regulations, 2) Obtaining All Necessary Approvals, Opinions And Administrative Decisions. Required For Implementation. Preface Order,3) Implementation Construction Intentions In Accordance With The Prepared Document Referred To In Points 3.1–3.5 Of Chapter Swz (Including The Obtained Agreements And Decisions), The Obtained Lawsuit. For Construction Works. And The Applicable Provisions Of The Act Of July 7, 1994 - Construction Law, 4) Implementation Of The Preceding Paragraph. Order In The Field Of Synthetic Surfaces, With Particular Emphasis On Recommendations Regarding Operating Conditions Works Specify. By Producers, In Particular In Terms Of Minimum Temperature And Permissible Air Humidity Level, 5) Implementation. Works Of The Nature Preparation, Auxiliary And Tidying Up, As Well As Work Necessary For Maintenance. Direct And Proper Organization. Construction Works Related To Implementations. Preface Order,6) Carrying Out Object-Oriented Research On Surfaces. In Terms Of Technical Correctness. And Functional. Constructed Facilities, In Accordance With From Chapter Xi Orlik
|