Quotation are invited for DFO Tank C Manhole Flange Serration Insitu Machining to Reinstate the Serration of Flange for DFO Tank C at L PH-I. TECHNICAL AND GENERAL SPECIFICATIONS, OUTSOURCING WORK L STATION PHASE I, JEBEL ALINAME OF WORK:·#IN-SITU MACHINING TO REINSTATE THE SERRATION OF FLANGE FOR DFO TANK CAT L PH-I. MANHOLES FLANGE AND FLANGE COVER, SIZE ID 930MM AND OD1140MM.QTY 2 SET.PERIOD OF WORK: ·#2 DAYS AFTER GETTING THE PO (1 DAY FOR ONE MANHOLE INCLUDING MANHOLEFLANGE AND MANHOLE COVER).SCOPE OF WORK:·#THE CONTRACTOR SHALL VISIT THE SITE AND MAKE HIMSELF FULLY FAMILIARWITH THE WORK SCOPE, PLANT ACCESS, FACILITIES, COMPLEXITIES, SAFETYMEASURES ETC., BEF ORE SUBMIT THE BID.·#TO GET A PTW, HWP CONTRACTOR HAS TO SUBMIT RISK ASSESSMENT FORMS ANDMETHOD STATEMENT PRIOR TO START THE WORK.·# CHECK CONDITION SUITABLE TO CARRY OUT WORK. CONDUCT SITE SURVEY ANDSAFETY INSPECTION TO ASSESS THE WORKING ENVIRONMENT.·#IF WORKING ENVIRONMENT IS SAFE PROCEED THE FOLLOWING STEPS,·#A SAFETY MEETING WILL BE HELD TO EVALUATE THE RISK INVOLVED INMETHODS TO BE USED. RISK ASSESSMENT AND TOOLBOX TALK TO BE GIVEN TO THEEMPLOYEES.·#MOBILIZE THE LABOR, EQUIPMENT, TOOLS, ETC. ON 24 HRS. NOTICE PERIOD.· #DISMANTLING OF THE FLANGES BY DEWA.·#CHECKING AND INSPECTION OF THE SURFACE FOR ANY CRACK/PETTING/CUTMARK/LEVELING FOR MANHOLE AND MANHOLE COVER, PLEASE NOTE THERE ARE TWOMANHOLES AND TWO MANHOLES COVER NEED TO BE MACHINED TO PREPARE THESERRATION AS PER REQUIREME NT AND TRY TO FINISH THE WORK WITH IN TWO DAYSIF MORE THAN TWO DAYS ARE REQUIRED DUE TO ANY ISSUE ARISES AT THE TIMEOF WORK PERFORM SHALL BE ALLOWED ACCORDINGLY.·#REPAIR/BUILT UP OF THE CRACK/PETTING/CUT MARK BY DEWA WELDER IFREQUIRED.·#FIXING OF THE MACHINE TO CA RRY OUT THE SURFACE PREPARATION TOWARDSMANHOLES AND MANHOLE COVERS.·#MACHINING/LEVELING OF THE MANHOLE FLANGE AND MAKE THE SURFACE R EADYFOR SERRATION·#NDT BY DEWA·#INSPECTION BY DEWA ENGINEER BEFORE REINSTATE THE SERRATION.·#REINSTATE THE SERRATION OF MANHOLES FLA NGE AND MANHOLES COVER AT THEGASKET SEATING AREA (FROM 1040MM TO 1140MM) FOR SIMILAR TYPE TWOMANHOLES OF THE TANK (2 MANHOLE FLANGES AND 2MANHOLE COVERS). NOTE:-CONTRACTOR CAN TAKE THE COVER IN THEIR WORK SHOP IF EASY FOR THEM TOPERFORM THE MACHINING.·#SERRATION S HALL BE MADE AS PER STANDARD.·#HOUSEKEEPING AND DISPOSAL OF WASTE FROM THE JOB TO BE DONE BEFORESITE CLEARANCE. Qty: 2 DFO Tank C Manhole Flange Serration Insitu Machining to Reinstate the Serration of Flange for DFO Tank C at L PH-I. attached scope of work .For any clarification please contact Mr. Nadeem 043226077, 0551338462nadeem.ahmad@dewa.gov.ae STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332601613)/$value
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 115229908
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.