Quotation are invited for Auxiliary Boiler 51 Evaporator Baffle Plate Replacement and Refractory Installation at K Station Auxiliary Boiler#51 Evaporato 1032603037 1 ITEM-00001 SCOPE OF WORK·#NUMBER OF BAFFLE PLATES TO BE REPLACED # 83 NUMBERS.·#PAYMENT WILL BE BASED ON THE ACTUAL QUANTITY OF BAFFLE PLATESRE PLACED. PARTY SHALL SUBMIT THEIR QUOTATION ACCORDINGLY CONSIDERING ONEMOBILIZATION.·#THE CONTRACTOR SHALL VISIT THE SITE AND MAKE HI MSELF FULLY FAMILIARWITH THE WORK SCOPE, PLANT ACCESS, FACILITIES, COMPLEXITIES, SAFETYMEASURES, NUMBER OF BAFFLE PLATES AND QUANTIT Y OF REFRACTORY ETC.,BEFORE HE SUBMITS HIS BID.·#TO GET A PTW CONTRACTOR MUST SUBMIT RISK ASSESSMENT AND METHOD OFSTATEMENT PRIOR TO START THE WORK.·#CHECK CONDITION SUITABLE TO CARRY OUT WORK. CONDUCT SITE SURVEY ANDSAFETY INSPECTION TO ASSESS THE WORKING ENVIRON MENT.·#A SAFETY MEETING WILL BE HELD TO EVALUATE THE RISK INVOLVED INMETHODS TO BE USED, RISK ASSESSMENT AND, TOOLBOX TALK TO 83 EA BE GIV EN TO THEEMPLOYEES.·#MOBILIZE THE LABOR, EQUIPMENT, TOOLS, ETC. ON 24 HRS. NOTICE PERIOD.·#THE CONTRACTOR SHALL WORK ON 24 HRS. BASI S TO COMPLETE THE JOB ONTIME BASED ON DEWA REQUIREMENT.·#IDENTIFY THE BAFFLES PLATES TO BE REMOVED AND REPLACED ALONG WITHDEWA ENGIN EER.·#REMOVE IDENTIFIED DAMAGED BAFFLE PLATES FROM THEIR LOCATION WITHOUTDAMAGING THE EVAPORATOR TUBES OR ADJACENT BAFFLES PLATES.·# REMOVE THE DAMAGED REFRACTORIES·#INSTALL NEW BAFFLE PLATES IN THE POSITION OF DAMAGED PLATES ANDENSURE THAT THE BAFFLE PLATES ARE FI RMLY SEATED ON THE STOPPERS.·#AFTER INSTALLATION OF ALL BAFFLE PLATES, JOINED INSPECTION ALONG WITHDEWA ENGINEER.·#ERECT THE SHUTTER ING FOR REFRACTORY WORK ( SHUTTERING MATERIALCONTRACTOR SCOPE) AUXILIARY BOILER 51 EVAPORATOR BAFFLE PLATE REPLACEMENT AND REFRACTORY INSTALLATION AT K STATION CONTACT - KALIYAMOORTHI - PH- 0529126916 kaliyamoorthi.v@dewa.gov.ae STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332601615)/$value
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 115229901
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.