The Scope Of The Assignment Consists Of The Engineering, Manufacturing, Inspection, Transport And Delivery Of The Materials Mentioned Below. The Order Is Divided Into Two Different Lots: Lot 1: • 15 Separators (Phase 1: 6 Pieces, Phase 2: 9 Pieces) • 8 Dripleg Storage Vessel (Phase 1: 8 Pieces) • 1 Brine Degasser Vessel (Phase 1) • 1 Expansion Vessel (Phase 1: 1 Pieces) • 3 Knock-Out Vessel (Phase 1: 2 Pieces, Phase 2: 1 Pieces) • 1 Air Pressure Vessel (Phase 1) And 1 Nitrogen Pressure Vessel (Phase 1). Lot 2: • 3 Shell & Tube Heat Exchanger (Phase 1: 2 Pieces, Phase 2: 1 Piece). The Scope Of The Framework Agreement For Each Plot Includes: • Part 1. Detailed Engineering Leading To An Rfc (Released For Construction). After Fid (Final Investment Decision And Therefore Subject To Fid): • Part 2. Manufacturing, Inspection, Transport And Delivery. The Second Part Of The Contract Will Be Awarded If A Positive Fid Has Been Taken. See Rfi
Contact Information
Contact Person
Paula Mol
Address
Concourslaan 17
Contact No.
+31 883614444
Email
info.rechtbanknoordnederland@rechtspraak.nl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 115226895
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.