|
Railway Traffic Control Software Development Services – Study, Development, Commissioning And Deployment Of A New Generation Centralized Control Center Product Core System (Pcc Ng Core Product). The Services Included In The Minimum Amount Of The Framework Agreement Are As Follows: - Project Management; - The Study, Development And Validation Of The Functions Of The Pcc Ng Core Product; - The Study, Development And Validation Of The Pcc Ng Core Product Software Including The Human Machine Interfaces (Hmi); - Integration, Testing And Commissioning Of Pcc Ng Core Product Functions In The Factory; - Instantiation, Testing And Commissioning Of The Pcc Ng Core Product On Metro Line 6 Including Monitoring Of Performance And Indicators, Probationary And Warranty Periods After Each Commissioning; - The Study, Development And Validation Of The Configuration Management Tool (Ogc) Of The Pcc Ng Core Product; - The Study, Development And Validation Of The Simulation Software For The Qualification And Training Bench; - The Study, Development And Validation Of A Qualification And Training Bench; - Delivery, Installation Of The Qualification And Training Bench On The Dedicated Ratp Site As Well As Training And Support From Ratp On This; - The Integration, Testing And Commissioning Of The Functions Of The Pcc Ng Core Product And The Instantiation Of Metro Line 6 In The Ratp Qualification Bench; - The Supply Of The Necessary Equipment For The Pcc Ng Core Product Validation Platform In The Factory And For The Ratp On-Site Qualification Bench; - The Instantiation Of The Training Tool (Ofo) For Metro Line 6; - The Study, Supply And Implementation Of The Switchover Systems Necessary For The Installation, Testing And Commissioning Of Application Systems Without Interruption Of Operation; - Coordination And Management Of Interfaces With Surrounding Systems In Particular: Traction Logic, The Train Movement Control System (Octys), Signaling, Online Traction Equipment, Computer Servers For Data Concentration, Passenger Information Systems, Timetables, Driver Service, Authorizations, Video, Sound System, Supervisor, Operation Assistance System (Sae) Equipment In The Countryside; - The Study And Development Of The Interfaces Necessary For The Integration Of The Core Product With The Qualification Bench On The Dedicated Ratp Site; - The Study, Development, Validation, Integration, Commissioning, Testing, Delivery And On-Site Installations Of Maintenance Tools; - Training Of Trainers (Operators And Maintainers) As Well As Users Of The Ratp Site Qualification Bench; - The Supply Of All Contractual Documentation Defined In The Market (Design, Integration, Tests, Tools, Etc.). The Services Included In The Maximum Amount Of The Framework Agreement Are As Follows: 1) The Services Of The Minimum Amount; 2) The Services That Can Be Ordered. They Can Understand
|