Hvac Packages – Eth Zurich, Cab/Cnb Replacement Building Automation, Bkp 243/244, Heat Distribution/Ventilation Systems. In Order To Achieve A Uniform Design At The Automation Level, Outdated Motors Are Replaced And Contactor-Based Star-Delta And Step Connections Are Eliminated. In Many Places, The Motors And/Or Fans And Pumps Are Also Replaced. Pumps And Fans With Ec Motors (With A Built-In Commutation Unit) Are Used In All Non-Critical Systems. In Critical Systems, Asynchronous Motors With External Frequency Converters Are Used. In Hvac Systems, The Le, Lk And Group Valve Drives Are Generally Replaced, And Volume Flow And Pressure Measurements Are Replaced And/Added (Especially 4-20Ma Sensors). Err Is Replacing The Cooling Ceiling Valve Drives And Room Controls/Sensors With Modbus-Capable Field Devices. The Radiator Valves And Dew Point Monitors Are Connected Conventionally Using I/O.
Contact Information
Address
Binzmühlestrasse 130
Contact No.
+41446338341
Email
rem.procurement@ethz.ch
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 115216381
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.