|
Construction Work – Federal Ministry For The Environment, Climate Protection, Nature Conservation And Nuclear Safety - Extension Building - Timber Construction Work - Award 1114/2026. Ve 316.2 - Wood Construction Work/Facade Btb (Din 18334/ Din18335/ Din18338/ Din18339/ Din18351/ Din18355/ Din18382) An Extension Of The Bmukn Is Being Built On The Stresemannstrasse / Erna-Berger-Strasse Property In Berlin-Mitte. The Building Is Divided Into Two 7-Story Components A And B, Which Are Connected To Each Other Via A Multi-Story Bridge. 1. Type And Scope Of The Service Wood Construction Work Approx. 145 M³ Glulam Supports; Approx. 50 M³ Bsh Edge Beams; Approx. 3150 M² Cross-Laminated Timber Ceilings D 240 Mm; Including Steel Components And Fire Protection Cladding, Approx. 890 M² Of Non-Supporting External Wall Elements In A Wooden Frame Construction Made Of Laminated Veneer Lumber Including Insulation And Planking, Approx. 360 M² Of Hipped Roof Elements With Integrated Dormers In A Wooden Frame Construction Made Of Laminated Veneer Lumber Including Insulation And Planking, Approx. 155 M² Of Non-Load-Bearing F90 External Wall As A Multi-Part Drywall Construction Steel Construction Work (In Connection With Wooden Construction) Approx. 5 Tons Of Steel Beams, Approx. 38 Tons Of Steel Angles For Supporting The Ceilings, Approx. 19 Tons Of Steel Frame As A Mansard Roof Construction. Window 217 Pieces Of Wood-Aluminium Window, Multi-Part With Ventilation Sash, Baffle Plate And Integrated Railing; 18 Pieces Of Wood-Aluminum Window, Multi-Part With Ventilation Sash, Baffle And Integrated Railing, Dormer Mansard Roof; 12 Pieces Of Aluminum Windows, 12 Pieces Of Wood-Aluminum Windows As Fire Protection Windows F90, 32 Pieces Of Cassette Roller Blinds For Anti-Glare Facade Cladding. Approx. 895 M² Of Rear-Ventilated Facade Made Of Pv Elements Including Connection Plates, Window Frames, Window Sills, Insulation; Approximately 235 M² Of Rear-Ventilated Facade Made Of Glass Elements In Pv Optics Including Connection Plates, Window Frames, Window Sills, Insulation; Approx. 675 M² Of Rear-Ventilated Facade Made Of Fiber Cement Panels Including Connection Flashings, Window Frames, Window Sills, Insulation; Approx. 180 M² Mansard Roof Cladding With Aluminum Standing Seam Covering And Attached Pv Or Glass Elements Including Connection Flashings, Dormer Cladding, Window Sills, Box Gutter, Insulation, Approx. 460 M Rainwater Downpipe Made Of Galvanised. Steel, Approx. 80 M Parapet Cover Including Interior Cladding, Installation Of The Pv Modules Consisting Of 7800 M Cabling, 15 Pcs Inverters, 6 Pcs Switching Units 2. Execution Deadlines • Execution (Of The Contract) Must Begin: Within 12 Working Days After Receipt Of The Request From The Client (§ 5 Paragraph 2 Sentence 2 Vob/B); The Request Is Expected To Reach You By September 25, 2026. • The Service Must Be Completed: In The 13Th Week Of 2028, At The Latest On The Last Working Day Of This Week. • Binding Individual Deadlines: Start Of Assembly Construction Site 5Th Week 2027, Building Tight (Installation Of Facade Elements Including Windows) 42Nd Week 2027. 3. Note - Bnb Certification A Bnb Certification In Gold And A Bnb Certification In Silver For The Outdoor Facilities Are Sought For The Building. The Contractor Must Contribute To The Successful Certification. The Contractor Has
|