|
Construction Work For Kindergarten Buildings - Engineering - Design, Authors Supervision And Implementation Of Smr Of A Site: Construction Of A Kindergarten In Upi Iv - For Odz (Pi 68134.2815.3274, 68134.2815.29 And 68134.2815.3273 According To Kkkr), Quarter 30, Residential Complex Vrabnitsa 2, District Vrabnitsa, Metropolitan Municipality. The Activities Included In The Subject Of The Public Procurement Include: 1. Investment Design Of A Site: Construction Of A Kindergarten In Upi Iv - For Ed (Pi 68134.2815.3274, 68134.2815.29 And 68134.2815.3273 According To Kkkr), Quarter 30, Town Vrabnitsa 2, District Vrabnitsa, Capital Municipality. A Technical Investment Project Is Being Prepared For All Parts, At Least In The Following Scope: Part Architecture; Part Constructions; Part Electrical And Fire Alarm; Part Heating, Ventilation And Air Conditioning (Hvac) Part Water Supply And Sewerage (Ww); Part Fire Safety; Part Park Planning And Landscaping; Part Geodesy; Part Technological; Part Health And Safety Plan; Part Puso; Part Accounting Documentation. Object Description And Identification. Location: The Object Is Located In Upi Iv - For Odz (Pi 68134.2815.3274, 68134.2815.29 And 68134.2815.3273 According To Kkkr), Quarter 30, Vrabnitsa Village 2, Vrabnitsa District, Sofia Municipality. The Project Is A Kindergarten With Two Crèches And Seven Childrens Groups With Twenty-Five Children Each. According To The Current Master Plan And Detailed Development Plan For The Territory, The Development Is A Low-Rise Development Falling Into The Development Zone Oo With The Following Parameters Of Free Development On The Property: Maximum Building Density - 30%; Kint. 0.6; Maximum Cornice Elevation = 8 Meters; Maximum Floor: 2 Floors; Minimum Landscaped Area: 50%; Area Of Upi Iv – 5,873 M2, Area Of Property With Identifier 68134.2043.4326 – 5,873 M2. 2. Execution Of Construction And Assembly Works (Smr) Construction Is The Fourth Category According To Art. 8, Para. 2, Item 3 Of Ordinance No. 1 Of 30.07.2003 On The Nomenclature Of Construction Types. The Implementation Of The Smr Of The Site Is Carried Out In Accordance With Part Three Construction Of The Zut And Begins After The Entry Into Force Of The Construction Permit And After Signing The Protocol For The Opening Of The Construction Site And Determination Of The Construction Line And Level Of Construction. The Technical Implementation Of The Construction Must Be Carried Out In Accordance With The Requirements Of The Regulations Relating To The Subject Of The Order, Technical Rules, The Technical Specifications Of The Construction Products, Materials And Equipment Used In The Construction, And The Good Construction Practices In The Republic Of Bulgaria And In The European Union. The Contractor Under This Public Procurement Should Perform The Smr, According To The Approved Investment Projects And The Issued Construction Permit. The Construction And Installation Works Should Be Carried Out According To The Terms Of The Contract, The Prepared, Agreed And Approved Investment Project Together With The Attached Detailed Quantity - Value Account For All Parts. 3. Exercise Of Authors Supervision During The Execution Of The Smr: In Connection With The Exact Compliance Of The Investment Projects During The Execution Of The Smr, The Contractor, Through Individual Legal Persons, Authors Of The Applicable Project Documentation In Parts, Will Carry Out Authors Supervision In Accordance With The Requirements Of Art. 162 Of The Zut And The Performance Contract. With The Implementation Of
|