|
Construction Of A Stage And A Roof Over The Dance Floor In Zamojska, Including The Following Construction Works: Earthworks, Foundations, Excavation For Foundation Footings And Pegs For The Stage Structure, Concrete Sleepers On The Ground - Lean C8/10 Concrete. 10 Cm Under The Feet, Reinforced Concrete Foundation Footings In System Formwork - C20/25 Concrete, Base For Wooden Columns And Pegs For Stage Structures - C20/25 Concrete, Anchors For Wooden Columns, Reinforcement Of Reinforced Concrete Structures, Bituminous Coating Moisture-Proof Insulation, Backfilling Of The Foundations, Removal Of Excess Soil After Covering The Foundations, - Wooden Structure Of Walls And Roof, - Columns 16 X 16 Cm, - Rafters 8 X 20 Cm, - Purlins 16 X 22 Cm, - Corner Rafters 10 X 20 Cm, - Struts 5 X 16 Cm, - Roof Covering, - Counter Battens, - Roof Membrane, - Lathing Roof Slopes Made Of Saturated Timber, Roof Covering With Coated Tile Sheets, Installation Of Ridge Tiles, Flashings Made Of Coated Sheet Metal, Roof Gutters Made Of Coated Sheet Metal, Downpipes Made Of Coated Sheet Metal, 1.80 Cm, - Stage Platform, - Wooden Structure For The Stage Floor, - Floor Made Of Planed Boards, 32 Mm Thick, - Wooden Stairs, 1.38 M Wide, - Sheathing Of Frame Walls - Casing Of The Stage Platform With Facade Boards, Thickness 32 Mm, - Impregnation Of Wooden Elements With Wood Impregnation, - Dance Slab, - Priming The Surface For Applying A Protective Resin Layer, - Epoxy Protective Coating - Securing The Reinforced Concrete Dance Slab With Resin, - External Electrical Installation 5/10 M, - Digging Trenches For Cables, Manually, Category Iii Soil, - Pouring A Layer Of Sand On Bottom Of The Cable Trench, Width Up To 0.4 M, Laying Pvc Protective Pipes Up To Fi 140 Mm-Dvk 75, Backfilling Cable Trenches, Manually, Category Iii Soil, Laying Cables In Cable Trenches - Manually, Cable 1.0 Kg/M, Covered With Foil, Laying Cables In Pipes, Hollow Bricks Or Closed Channels, Cable Up To 1.0 Kg/M - Approach To Wg And Zl 1 Connectors, Distribution Devices (Sets) On Foundations, Weight Up To 20 Kg, On Prefabricated Foundations - Zl-1, Dry Processing Of Cables Up To 1 Kv With Plastic Insulation And Coating, 4-Core Al Cable Up To 50 Mm2, Internal Power Lines + Switchboards, Laid Vidinur Pipes N.T., Substrate Other Than Concrete, Fi 47 Mm, - Cables Pulled Into Pipes And Closed Channels, Channels, Cross-Section Up To 50 Mm2, - Switchboards And Housings, Board Up To 10 Kg Rn3x12-55, - Installation Of A Gwp Switch, - Modular Equipment In Switchboards, Overcurrent Switch, 1 Pole, - Accessories Modular In Switchboards, 3-Pole, Electrical Equipment, Weight Up To 2.5 Kg - Surge Arresters, Additional Equipment For Modular Switchboards, 3-Pole Switching Bus, Additional Equipment For Modular Switchboards, Connection Strip (Terminal Strip), - Connecting Wires To Terminals Or Pins, Single Cable Up To 16 Mm2, Checking And Measuring The Lv Electrical Circuit, Circuit 3-Phase, - Internal Installation, -
|