4.1. The Subject Of The Order Is The Performance Of Construction, Sanitary And Electrical Works Related To The Reconstruction Of The Water Intake In The Town Of Pniówno, Including The Modernization Of The Water Treatment Plant, Reconstruction Of The Water Treatment Plant Building, Construction And Reconstruction Of Technological, Water Supply, Sewage And Electrical Installations And Renovation Of Existing Technical Infrastructure Facilities As Part Of The Investment Task Titled Reconstruction Of The Water Intake In The Town Of Pniówno In The Wierzbica Commune, The Works Include, Among Others: 4.2.1 In The Sanitary Industry: 1) Delivery, Selection, Assembly, Commissioning Of A Water Treatment System With External Drainage Of Washing Water With Sedimentation Tanks, 2) Selection And Installation Of A Second-Degree Pumping Station And Reconstruction Of The Technological System In The Station Building, 3) Construction Of New Inter-Site Underground Installations, Water Supply And Sewage Systems In The Water Intake Area And Connecting Them With Existing Pipelines,4) Reconstruction Of The Casing Of Two Deep Wells Located On Plots No. 3 And 10 In Pniówno By Installing Lange Type Casings,5) Expansion And Reconstruction Of The Ventilation Installation,6) Installation Of A Shower In The Sanitary Facility,7) Issues Related To The Control And Automation Of The Water Intake,8) Unblocking And Strengthening The Rinse Water Outlet On Plot No. 247 In The Area Of Święcica, Cleaning (Grubbing Out) The Ditch, 9) Training Employees In The Operation And Operation Of The Water Treatment Plant; 4.2.2 In The Field Of The Construction Industry: 1) Lowering The Floor In The Technological Hall Room By 20 Cm, 2) Laying Foundations For The Equipment, 3) Bricking Up The Openings For The Air Intake And Exhaust From The Power Generator In The Technological Hall Room, 4) Dismantling Part Of The Wall In The Utility Room And Installing A Lintel (It Is Allowed To Dismantle The Wall To The Ceiling Using Cable Trays To Suspend Existing Electrical Cables),5) Dismantling The Door, Cutting Out The Door Frame And Bricking Up The Opening In The Internal Wall To The Chlorination Room,6) Cutting Out Holes For The Air Intake And Exhaust From The Power Generator In The Utility Room,7) Installing Hygro-Controlled Air Vents In The Existing Windows,8) Removing The Window, Cutting Out And Inserting A Door In The External Wall To The Chlorination Room,9) Dismantling The Door To The Toilet Room, Installing A Shower,10) Reversing The Opening Direction Of The Door To The Sanitary Room,11) Completing And Making New Ceramic Floor And Wall Claddings,12) Painting Walls And Ceilings With Emulsion Paints,13) Supplementing The Insulation Of External Walls In Places Where The Holes Were Bricked Up,14) Painting The Buildings Facade,15) Covering The Roofs Of The Housings Entrances To Water Tanks With Heat-Welded Felt,16) Construction Of Gutters And Downpipes On The Casings Of The Entrances To Water Tanks In Order
|