1. The Subject Of The Order Is The Performance Of Renovation And Construction Works As Well As Electrical Works In The Building Of Primary School No. 1. Maria Skłodowska-Curie At Ul. Świdwińska 7 In Białogard, Including Renovation Of Sanitary Rooms, Corridors, Classrooms, Library, Part Of The Gymnasium And Back-Up Rooms, Along With Modernization Of The Electrical Installation.2. The Scope Of Work Includes:A. Bathrooms On The 1St And 2Nd Floors• Securing The Rooms For The Duration Of The Works,• Demolition Works Including Dismantling Of Wall And Floor Coverings, Sanitary Equipment, Fittings, Radiators, Valves, Fittings And Doors,• Removal And Disposal Of Demolition Materials,• Execution Of Layers Leveling The Substrates,• Execution Of Moisture-Proof Insulation Of Floors And Walls,• Execution Of Seals In The Places Where The Walls Connect With The Floor,• Preparation Of Substrates For New Cladding,• Installation Of New Wall Cladding With Ceramic Tiles,• Installation Of New Floor Cladding With Ceramic Tiles (Girls Bathroom - 1St Floor),• Repair, Preparation And Painting Of Wall Fragments Not Covered By Cladding,• Installation Of New Internal Doors Made Of Pvc,• Installation Of New Washbasin Faucets, Washbasins With Siphons, Toilet Bowls With The Necessary Accessories,• Replacement Of Inlet Connections To Devices Sanitary Installations,• Installation Of Floor Drains,• Installation Of Bathroom Equipment (Handles, Dispensers, Containers, Mirrors And Other Accessories),• Replacement Of Radiator Valves,• Reassembly Of Radiators,• Performance Of Tightness Tests And Commissioning Of The Installation.B. Second Floor Corridor With Staircase• Protection Of Working Surfaces,• Removal Of Old Paint Coatings,• Repair, Replenishment And Local Strengthening Of Plasters,• Preparation Of Surfaces By Filling And Priming,• Painting Of Walls And Ceilings,• Painting Of Steel Balustrades,• Replacement Of Doors,• Making New Plinths Made Of Pvc Lining,• Dismantling And Reassembly Of Lighting Fixtures,• Works Related To The Central Heating Installation Including Disassembly And Reassembly Of Radiators, Replacement Of Valves And Tightness Tests Of The Installation. C. Classrooms No. 12, 14, 15 And 16• Disassembly Of Existing Floor Coverings And Skirting Boards,• Preparation Of The Subfloor And Installation Of Leveling Layers,• Installation Of New Pvc Floor Coverings Including Covering The Walls,• Repair Of Plasters And Filling Of Gaps On The Walls,• Preparation Of Wall And Ceiling Surfaces,• Priming And Painting Of Walls And Ceilings,• Disassembly And Reassembly Of Fixtures Lighting, • Works Related To The Central Heating Installation, Including Replacing Valves, Dismantling And Reassembling Radiators And Performing Tightness Tests Of The Installation, • Replacing The Sink With A Cabinet In Room No. 12, • Replacing The Door To The Back Room Of Room No. 12.D. Room No. 17• Securing The Room For The Duration Of The Works,• Preparing The Surfaces Of Walls And Ceilings,• Repairing
|