Architectural Design Services - Design Framework Agreement - Airport Development. Planning Framework Agreement For 96 Months Regarding The Planning Tasks Of The Long-Term Airport Development Program Of Liszt Ferenc Airport In Order To Implement The Significant, Long-Term Development Plan Of The Airport, The Contracting Authority Wishes To Enter Into A Framework Agreement With The Selected Bidders Regarding General Design And Other Engineering Tasks. The Tenderer Is Currently Preparing A Significant, Long-Term Passenger Terminal Development Program. The Program Includes The Construction Of A New Ground-Side Interface (Main Terminal Building - Mtb), The Reorganization And Expansion Of The Existing T2a And T2b Terminals And Skycourt, As Well As The Creation Of New Passenger Piers. In Addition, The Program Covers The Expansion And Transformation Of The Ground-Side Apron, The Air Traffic Apron And Secondary Facilities, As Well As The Expansion Of The Roads And Public Utilities Serving Them. These Developments Are Collectively Referred To In The Planning Framework Agreement And The Technical Description As Airport Development Program Or Investment Or Project, Their Detailed Content Is Contained In Annex A Of The Technical Description. The Airport Development Program Includes The T+ Terminal Development Program As Well As Other Long-Term Airport Development Tasks. 1.1. Air Traffic Apron And Related Taxiway Development - Phase 0.5 (~65,000 M2) 1.2. Air Traffic Apron And Associated Taxiway Development - Phase 1 (~110,000 M2) 1.3. Development Of T2a, T2b And Skycourt Buildings (~48,000 M2) 1.4. Construction Of The E Passenger Pier (~20,000 M2) At The Same Time With Overlaps, Ak Is Expected To Cost 10-12 Million. It Will Conclude Contracts Worth Eur. The Planning Contracts To Be Executed At The Same Time Are Expected To Affect Buildings With A Total Net Floor Area Of 30,000 M2 (Warehouse Or Storage Or Logistics, Passenger Traffic, And Public Use Building), And An Expected Area Of 175,000 M2 Forecourts And Taxiways. Types Of Buildings And Structures Affected By The Airport Development Program • Air Traffic Concourse And Related Taxiway Development Phase 0.5 • Air Traffic Concourse And Related Taxiway Development Phase 1 • T2a, T2b And Skycourt Buildings • Construction Of Passenger Pier Marked E • Control Tower • Aircraft Hangar • Air Traffic Concourse • Taxiway • Runway • Terminal Building • Passenger Pier • Office Building, Administrative Building • Education And Training Building • Service Building • Hotel • Warehouse Building • Bus Stop, Bus Station • Parking Garage • Railway Station • Energy Center, Utility Building • Geothermal Power Plant • Gate Building • Fuel Filling Station • Other Service Building • Roads, Parking Lots And Utilities • Other Service Systems Content Of General Planners Basic Services • Preparation Of Investment Program • Preparation Of Concept Plan • Preparation Of A Sketch Plan • Preparation Of An Approval Plan • Preparation Of Authorization Documentation And Acquisition Of A Building Permit (If Applicable) • Preparation Of Execution Documentation • Design Support For The Request For Proposals For The Selection Of A Contractor.
Contact Information
Contact No.
+36 707041603
Email
istvan.kocsis@bud.hu
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 115121383
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.