Uim - Construction Works (Kn) (2-1-1), Excavation Of Soil By Throwing It Aside With Foreign-Made Excavators With A Bucket Capacity Of 0.65(0.5-1) M3, Soil Group: 2, Manual Digging Of The Soil In Trenches Up To 2 M Wide And Up To 2 M Deep With The Application Of Fasteners, Filling Pits And Trenches With Bulldozers By Moving The Soil Up To 5 M, Power Of The Bulldozer: 59 (80) Kw (A.G.), 1St Group Of Soil, Soil Compaction With Pneumatic Rammers, Soil Group: 1, 2, Excavation Of Soil With Excavators With A Capacity Of 0.65 (0.5-1) M3 Of Chalovu By Loading It Onto Dump Trucks, Dump Truck, 17 T Transport Distance - 3 Km. 1St Class Cargo, Construction Of Sub-Bases: Gravel, Construction Of Concrete Preparation Layer (B 7.5), Fixing Friction Waterproofing: One Layer Thickness 2 Mm, Fixing Friction Waterproofing: Add To Norm 11-01-004-05 For Each Subsequent Thickness Of 1 Mm Layer, Construction Of Strip Foundations: Reinforced Concrete, When The Width Of The Upper Side Is Up To 1000 Mm (B 25), A-3 Class Fixture, A-1 Class Fixture, Construction Of Concrete Columns In Wooden Formwork, Height: Up To 4 M, Perimeter Up To 3 M (B 25)
Contact Information
Contact Person
Azad Məmmədov
Address
AZ 1005, Bakı, Akademik Ə.Əlizadə küçəsi, 10
Contact No.
+994 12 598 26 96
Email
azad.mammadov@azerenerji.gov.az
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 115085394
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.