|
Construction Sign In Dimensions Of 4.0 Mont. Str. Mad. 8X8, With Pmvv Sticker 60X60cm Every 10M (5X Reuse), Mobilization And Demobilization Of Container Leased For Construction Shed, Monthly Container Rental For Office, Dim. 6.00X2.40M, With Bathroom (Toilet+Lavat+Shower And Basin), Incl. Door, 2 Windows, Open For Air Conditioning, 2 Pt Lighting, 2 Electric Tone. And 1 Telephone Tone. Thermal Insulation (Ceiling And Walls), Floor In Comp. Naval, Cert. Nr18, Incl. Decontamination Report., Monthly Container Rental For Cafeteria, 2 Electrical Sockets. And 1 Telephone Socket. Thermal Insulation (Walls And Ceiling), Floor In Comp. Naval Painted, Monthly Rental Of Container For Changing Room, Circulation Shutters, 1 Lighting Pt, Thermal Insulation (Ceiling), Monthly Rental Of Sanitary Container, Incl Door, Base, 2 Light Pts, 1 Landing Pt, 3 Vases, 3 Wash Basins, Urinal Trough, 6 Showers (1 Electric), Lathe, Registers, Comp Floor. Naval Painted, Cert Nr18 And Decontamination Report, Monthly Container Rental For Warehouse, 1000 L Polystylene Reservoir, Including Wooden Support Of 7X12cm And 5X7cm, Elevated 4M, According To Project (2 Uses), Water Network, With Water Inlet Standard Dia. 3/4, Conf. Spec. Cesan, Inc. Pipes And Connections For Power Supply, Distribution, Overflow And Cleaning, Cons. The Standard A 25M, Conf. Project (2 Uses), Light Network, Incl. Standard Three-Phase Power Input, Connection Cable To Sheds, Distribution Board, Disj. And Power Wrench (When Necessary), Cons. 20M Between Standard And Qdg, Sewage Network, Containing Pit And Filter, Including Pipes And Connection Connections Between Boxes, Considering A Distance Of 25M, According To Project (1 Use), Manual Excavation In 1A Material. Category, Up To 1.50 M Depth, Mechanical Excavation In 1A Material. Category, Backfilling Piled From Foundation Pits, In Layers Of 20 Cm, Acquisition Of Clay Material For Backfilling, Considering 30% Of Blistering. (Material Delivered And Unloaded On Site), Spreading Of 1St Category Material With A Tracked Tractor, Preparation And Mechanical Compaction Of The Land With A Compactor Roller For Laying, Backfill Mechanically Compacted With A Portable Compactor With Reuse Of Material, Backfilling Of Trenches, Exclusive Compaction, Loading, Maneuvering And Unloading Of Rubble And Soil And/Or Granular Material Coming From Demolitions, Removals And/Or Excavations To Be Transported To The Ctrv-Vv For Final Disposal To Be Given By Pmvv, Transportation Of Granular Material And/Or Rubble Originating From Demolitions And/Or Removals To The Ctrv (Dmt Up To 30 Km) For Final Disposal To Be Given By Pmvv (Txkm = Tkm), Supply, Preparation And Application Of Lean Concrete With Minimum Cement Consumption Of 250 Kg/M3 (Brita 1) - (5% Losses Already Included In The Cost), Supply And Application Of Machined Concrete Fck=30 Mpa - Considering Manual Launch For Infrastructure (5% Losses Already Included In The Cost), 12Mm Resin Plywood Sheet Formwork, Taking Into Accounts For Use 3 Times (Including Material, Cutting, Assembly, Propping And Unmolding), Folding And Placing In Formwork, Of Ca-60 B Fine Reinforcement, Diameter Of 4.0 To 7.0 Mm, Of Ca-50 To Medium Reinforcement, Diameter Of 6.3 To 10.0 Mm, Steel Mesh Reinforcement Of Ca-60 (Q-196) Ø 5.0 Mm, Mesh 10
|