|
According To Swz: 2.1.1. Name Of The Order: Execution Of Construction Works As Part Of The Investment Project Called Replacement Of Sswin, Cctv - Ostrów Wlkp., Ul. Wysocka.2.1.2. Type Of Order: Construction Work.2.1.3. Subject Of The Order: Execution Of Construction Works As Part Of The Investment Project Called Replacement Of Sswin, Cctv - Ostrów Wlkp., Ul. Wysocka. (...)2.1.5. A Detailed Description Of The Subject Of The Order Is Included In Annex No. 1 To Annex No. 9 To Swz.2.1.6. Requirements Regarding The Employment Of People: 2.1.6.1. In Accordance With The Regulation Contained In Art. 95 Section 1 Of The Public Procurement Law, The Contracting Authority Requires, During The Execution Of The Order, For The Entire Period Of Performance Of The Work Entrusted To Them, Employment By The Contractor Or Subcontractor, On The Basis Of An Employment Relationship, On A Full-Time Basis (Full-Time), Within The Meaning Of The Labor Code And For Remuneration Of No Less Than The Minimum Remuneration For Work, Determined Pursuant To Art. 6-7 Of The Act On Minimum Wages - Persons Performing The Following Activities: 2.1.6.1.1. Involving The Operation, Repair, Assembly Or Disassembly Of Devices, Installations And Power Networks With A Rated Voltage Not Higher Than 1Kv,2.1.6.1.2. Control And Measurement Of Devices, Installations And Power Networks With A Rated Voltage Not Higher Than 1Kv,2.1.6.1.3. Consisting In Embedding Culverts In Walls And Ceilings,2.1.6.1.4. Involving Laying Cable Wires,2.1.6.1.5. Consisting In The Installation Of Swin System Elements,2.1.6.1.6. Involving The Installation Of Cctv System Elements,2.1.6.1.7. Consisting In Tidying Up The Place Of Work Being Carried Out, Which, In The Opinion Of The Ordering Party, Consists In Performing In The Manner Specified In Art. 22 § 1 Of The Labor Code;2.1.6.2. Detailed Definition Of: The Method Of Verifying The Employment Of People, As Well As The Contracting Authoritys Rights To Control The Contractors Compliance With The Requirements Related To The Employment Of People And The Sanctions For Failure To Meet These Requirements - Included In Annex No. 9 To Swz.2.1.7. Equivalent Solutions:2.1.7.1. The Subject Of The Contract Was Not Written In The Manner Referred To In Art. 99 Section 5 Of The Public Procurement Law, I.E. By Indicating Trademarks, Patents Or Origin, Source Or Specific Process That Characterizes The Products Or Services Provided By A Specific Contractor, 2.1.7.2. The Subject Matter Of The Contract Is Described By Reference To The Standards, Technical Assessments, Technical Specifications And Technical Reference Systems Referred To In Art. 101 Section 1 Point 2 And Section 3 Of The Public Procurement Law, And Thus In Accordance With Art. 101 Section 4 Of The Public Procurement Law: 2.1.7.2.1. Solutions Equivalent To Those Described In The References Already Mentioned Are Allowed,2.1.7.2.2. Each Of The References Already Made Is Accompanied By The Words Or Equivalent. (...)2.1.9. The Con
|