|
1) The Subject Of The Order Is The Performance Of Construction Works As Part Of The Investment Titled: Modernization Of Fire Protection Installations In The Building Of The Faculty Of Natural Sciences At Ul. Będzińska 60. This Facility Consists Of 5 Buildings. The Works Will Be Performed In The Auditorium Complex And The Interfaculty Hall.2) The Subject Of The Order Includes: - Performance Of All Auxiliary Works To Prepare The Ground (In Particular Masonry, Locksmith And Welding Works, Assembly Of Installation Equipment Elements, Etc.), - Completion Of All Materials Needed For The Execution Works Specified Below, - Construction Of New Cable Routes, - Laying Of Cables And Wires, - Laying And Connecting Cabling, - Laying All Materials In A Manner And In A Place Consistent With The Technical Documentation, - Assembly, Connection And Commissioning Of All Necessary System Elements, - Carrying Out Measurements, - Marking In Accordance With The Technical Documentation Of All Designated Cables And Wires, - Carrying Out The Required Tests And Examinations And Confirming With Protocols Qualifying The Installed Element Of The Installation, - Demolition Works, Dismantling Of Lighting Fixtures, - Expansion Of Existing Power Supply Switchboards, Installation Of Electrical Apparatus, - Construction And Protection Of Fire Passages, - Construction Of A Hydrant Installation From Galvanized Steel Pipes, - Delivery, Installation Of Hydrants And Fittings, Anti-Corrosion Protection Of Pipelines, - Delivery, Assembly, Connection And Configuration Of The Fire Alarm System (Ssp), - Delivery, Assembly, Connection And Configuration Of The Suction System (Sz), - Delivery, Assembly, Connection And Configuration Of The Smoke Exhaust System (Odd), - Delivery, Assembly, Connection And Configuration Of The Voice Warning System (Dso), - Delivery, Assembly, Connection Of The Emergency And Evacuation Lighting System, - Performance Of Necessary Works To Restore The Original Condition Of The Rooms (Replenishing Surfaces Made Of Plasterboards, Cement-Gypsum Plasters And Painting Works), - Training Of End Users In The Administration And Supervision Of The Systems.3) Completion Date Of The Subject Of The Order: Up To 9 Months From The Date Of Handing Over The Work Site. The Handover Of The Work Site Will Take Place Within 7 Business Days From The Date Of Conclusion Of The Agreement.4) A Detailed Description Of The Subject Of The Order Is Included In The Design Documentation, Which Consists Of: Technical And Executive Designs For Individual Industries, Stwiorb And Bills Of Quantities, Which Documents Together With The Contract Should Be Considered Together.
|