1. The Subject Of The Order Is The Renovation Of The Sidewalk In Świerczyna Commune. Osieczna. During The Implementation Of The Investment, The Sidewalk And Adjacent Entrances To The Property Should Be Renovated. The Detailed Scope Of The Investment Is Described In Point 2 And Presented In Graphic Attachments, I.E. Pzt And Cross-Sections.2. The Scope Of The Order Includes: 1) Demolition Of The Sidewalk And Exits Made Of Concrete Elements (Concrete Slabs, Concrete Cubes And Monolithic Concrete Elements) On The Road Section From Km 6 + 216 To Km 6 + 551, 2) Demolition Of Road And Ramp Curbs Along The Edge Of The Road, 3) Formation Of The Slope And Its Strengthening, 4) Installation Of A Slope Balustrade, 5) Construction Of Channels For The Sidewalk And Exits, 6) Construction Of The Foundation For The Sidewalk And Exits, 7) Installation Of Road And Driveway Curbs (Along The Entire Section) And Concrete Edges On A Concrete Footing With Resistance, 8) Laying The Surface Of The Sidewalk And Exits With Paving Stones (Adapt The Colors And Shape Of The Stones To The Previously Rebuilt Section Of The Sidewalk, I.E. Red For The Exits, Uncolored Stones For The Sidewalk), 9) Tidying Up The Area After Completed Works.3. The Works Should Be Carried Out In Accordance With Applicable Technical And Construction Regulations As Well As General Knowledge And Principles Of Performing Construction Works. Before Submitting An Offer, The Contractor Should Conduct A Local Inspection Of The Area Of Construction Works. The Attached Cost Estimates Are Indicative And May Not Include All The Works Necessary To Complete The Task.4. During The Execution And Acceptance Of The Works Covered By The Order, The Rules And Requirements Specified In: 1) Technical Drawings Attached To The Procedure, 2) Applicable Standards, 3) Technical Guidelines Adopted By The Order Of The Zdp Manager No. 2/2026 And Available On The Website: Http://Zdp.Leszno.Pl/Zarzazenie-Kierownika-Nr-2-2026/, 4) Offer Cost Estimate Will Apply.5. All Materials And Work Technologies Used Must Meet The Requirements Set Out In Applicable Standards;6. Before Installing Any Materials, The Contractor Will Provide The Supervision Inspector With A Certificate Of Approval Of This Material For Use In Construction And Compliance With The Requirements Specified In The Technical Specifications And Polish Standards In Order To Obtain Consent For Its Use. To Perform The Order, The Contractor Will Use Construction Products Placed On The Market In Accordance With The Principles Set Out In The Act Of April 16, 2004 On Construction Products (Consolidated Text: Journal Of Laws Of 2021, Item 1213);7. Any Post-Demolition Materials And Earth Masses Obtained During The Construction Works Should Be Managed On Your Own. The Above Should Be Included In The Offer Price, Including The Landfill Fee. Disposal Should Be Carried Out In Accordance With The Provisions Of The Act Of December 14, 2012 On Waste (Consolidated Text: Journal Of Laws Of 20
Contact Information
Address
Zarząd Dróg Powiatowych,Leszno,64-100,Wielkopolskie,Pl417 - Leszczyński
Email
zamowienia@zdp.leszno.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 114615771
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.