|
Construction Of Ramps For The Disabled To The Primary School In Końskowola, Zpo In Pożog And The Primary School In Chrząchów. The Subject Of The Order Is A Construction Work Called Construction Of Ramps For The Disabled To The Primary School In Końskowola, Zpo In Pożog And The Primary School In Chrząchów. The Investment Includes: 1. Reconstruction Of The Ramp And Renovation Of Stairs At The Primary School In Końskowola. The Works Include: 1) Demolition Of The Concrete Pavement, 2) Partial Demolition Of The Existing Ramp, 3) Demolition Of Tile Coverings For Stairs And Ramps, 4) Disassembly Of Part Of The Existing Railing Of The Ramp,5) Demolition Of A Fragment Of External Stairs,6) Earthworks (Excavations, Backfilling Of Excavations),7) Construction Of Foundations For The Ramp,8) Construction Of Foundations And Walls From Concrete Blocks,9) Insulation Of Walls And Foundations,10) Construction Of A Crushed Aggregate Foundation,11) Construction Of A Concrete Foundation,12) Laying Of Tiles Covering The Stairs And Ramps 30Mm Thick Granite,13) Applying Silicate Plaster On The Vertical Surfaces Of The Ramp Walls Above The Ground,14) Making And Installing Painted Carbon Steel Barriers (The Railings Should Be Adapted To The Existing Ones),15) Making Fragments Of The Pavement,16) In The Event Of Damage As A Result Of Works - Restoring The Previous Condition, I.E. Repairing Any Damage.2. Construction Of A Ramp At The Primary School In Chrząchów. The Works Include: 1) Demolition Of The Surface Made Of Concrete Cubes, 2) Demolition Of The Surface Made Of Mineral And Bitumen Masses, 3) Partial Demolition Of The Existing Stairs, 4) Earthworks (Excavations, Backfilling Of Excavations), 5) Construction Of Footings For The Ramp, 6) Laying Of A Palisade From The Concrete Elements Of The Ramp Walls, 7) Construction Of The Subfloor In The Form Of A Compacted Layer Of Cement-Stabilized Sand,8) Laying A Driveway Made Of Concrete Slabs,9) Making And Installing Painted Carbon Steel Railings,10) Making Fragments Of The Sidewalk/Strip,11) In The Event Of Damage As A Result Of Works - Restoring The Previous State, I.E. Repairing Any Damage.3. Construction Of A Slipway In The Complex Of Educational Institutions In Stary Pożog. The Works Include: 1) Demolition Of The Surface Made Of Concrete Cubes/Strips, 2) Earthworks (Excavations, Backfilling Of Trenches), 3) Construction Of Foundation Strips For The Slipway, 4) Laying Of A Palisade From Concrete Elements Of The Slipway Walls, 5) Construction Of A Base In The Form Of A Compacted Layer Of Sand Stabilized With Cement, 6) Laying The Platform And Ramp Made Of Concrete Slabs/Paving Stones,7) Making And Installing Painted Carbon Steel Railings,8) Making Fragments Of The Sidewalk/Strip,9) In The Event Of Damage As A Result Of Work - Restoring The Previous Condition, I.E. Repairing Any Damage. 4. Reconstruction Of The Window Opening In The Complex Of Educational Institutions In Stary Pożog. The Works Include: 1) Carving Out The Exi
|