|
1. The Subject Of The Order Is The Implementation Of The Investment Called Reconstruction And Renovation Of Internal Roads In The Kozłów Commune, Under Which The Contractor Is Obliged To Perform: A. Task 1 Entitled Reconstruction Of The Internal Road In The Town Of Bogdanów - Plot No. 183, Section From Km 0+000 To Km 0+080, Length 80 M, Including The Implementation Of: A. Preparatory And Demolition Works, B. Earthworks, C. Foundation Works, - In Order To Improve Road Traffic Safety And Bring The Road Surface To The Correct Parameters In Terms Of Longitudinal And Transverse Evenness, Slopes, Roughness And Evenness, And Strengthening The Road Structure, B. Tasks 2 Titled Renovation Of The Internal Road In The Town Of Kozłów - Plot No. 1256, Section From Km 0+000 To Km 0+160, Length 160 M, Including The Execution Of: A. Earthworks, B. Foundation, - In Order To Improve Road Traffic Safety And Bring The Road Road To The Correct Parameters In Terms Of Longitudinal And Transverse Evenness, Slopes, Roughness And Evenness, C. Tasks 3 Titled Reconstruction Of The Internal Road In Marcinowice - Plot No. 772/4, Section From Km 0+000 To Km 0+350, Length 350 M, Including The Implementation Of: A. Earthworks, B. Foundation, - In Order To Improve Road Traffic Safety And Bring The Road Surface To The Correct Parameters In Terms Of Longitudinal And Transverse Evenness, Slopes, Roughness And Evenness, And Strengthen The Road Structure, D. Tasks 4 Entitled Reconstruction Of The Internal Road, Plot No. 2336, In The Town Of Kępa, From Km 0+000 To Km 0+070, Length 70 M, Including The Implementation Of: A. Preparatory And Demolition Works, B. Earthworks And Drainage Works, C. Foundation, D. Pavement, - In Order To Improve Road Traffic Safety And Bring The Road Surface To The Correct Parameters In Terms Of Longitudinal Evenness And Transverse, Slopes, Roughness And Evenness, As Well As Strengthening The Road Structure. 2. The Detailed Description Of The Subject Of The Order Is:A. Individually For Each Task: A. Technical Design (Descriptive Part And Drawing Part) - Regarding Tasks 1 - 3 / Construction And Executive Design (Descriptive And Drawing Part) - Regarding Task 4, B. Bill Of Quantities, B. Jointly For All Tasks: Technical Specifications For The Execution And Acceptance Of Works (Stwior), Provided That: A. In The Event Of Repealing The Standards Indicated In The Stwior, The Ordering Party Allows The Use Of Standards That Have Replaced The Repealed Standards, B. The Provisions Of The Stwior Shall Apply To The Extent To Which They Are Not Inconsistent With The Provisions Of The Construction Design / Technical Design Or Swz With Annexes, Hereinafter Referred To As Annex No. 1 - Description Of The Subject Of The Order.
|