Construction Work – Carpentry, Roofing And Plumbing Work. Addition To Paragraph 2.1, Approx. Quantities: The Subject Of The Order Is The Carpentry, Roofing And Plumbing Work: House 3A - Connecting Structure: • Construction Of The New Roof Structure As A Flat, Sloping Hipped Roof Construction, Approx. 7 To 7.5° Dn, Approx. 438 M² Roof Area • Roof Structure: Vapor Barrier On The Existing Reinforced Concrete Ceiling, Thermal Insulation Mineral Wool, Roof Construction, Formwork, Double Standing Seam Covering, Titanium Zinc, Installation Of 3 Skylightshouse 3B - Extension Building:•Construction Of The New Roof Structure As A Flat Sloping Hipped Roof Construction, Approx. 7° Dn, Approx. 191 M² Roof Area•Roof Structure: Vapor Barrier On Existing Reinforced Concrete Ceiling, Thermal Insulation Mineral Wool, Roof Construction, Formwork, Double Standing Seam Covering, Titanium Zinchouse 3 - Intermediate Wing West And East • Manufacture Of The New Roof Trusses As Gable Roof Constructions, Approx. 45° Dn, Approx. 855 M² Roof Area • Roof Structure: Vapor Barrier, Mineral Wool Insulation Between Rafters, Roof Construction, Formwork, Underlayment, Counter Battens, Supporting Battens, Plain Beaver Tail Double Roofing, Installation Of 6 Roof Windows, Production Of 14 Dormers, Reinforcement Of The Supporting Structure Using Steel Frame Structures, Approx. 11.15 Tons Of Steel Weighthouse 3 - West And East Side Wings•Dismantling The Roof Covering, Battens, Etc. To Expose The Load-Bearing Framework•Renovating The Existing Roof Trusses As Hipped Roof Constructions, Approx. 45° Dn, Approx. 1,205 M² Roof Area•Roof Structure: Vapor Barrier, Under-Rafter Insulation Incl. Uk, Intermediate Rafter Insulation Mineral Wool, Roof Construction, Formwork, Underlayment, Counter Battens, Supporting Battens, Plain Beaver Tail Double Roofing•Installation Of 14 Roof Windows•Installation Of 6 Smoke Exhaust Windows•Production Of 14 Dormers•Reinforcement Of The Supporting Structure Using Steel Frame Structures And Steel Profiles, Approx. 13.27 Tons Of Steel Weighthouse 3 - Central Projection•Dismantling The Roof Covering, Battens, Etc. To Expose The Load-Bearing Framework•Renovation Of The Existing Roof Trusses As Hipped Roof Constructions, Approx. 45° Dn, Approx. 494 M² Roof Area•Roof Structure: Vapor Barrier, Under-Rafter Insulation Incl. Uk, Between-Rafter Insulation Mineral Wool, Roof Construction, Formwork, Underlayment, Counter Battens, Supporting Battens, Plain Tile Double Roofing•Installation Of 4 Pieces Of Roof Windows•Installation Of 1 Piece Of Smoke Exhaust Window•Production Of 1 Piece. Dormers • Reinforcement Of The Supporting Structure Using Steel Frame Structures And Steel Profiles, Approx. 3.5 Tons Of Steel Weight • Various Plumbing Work: Approx. 500 M Of Gutters, Approx. 452 M Of Downpipes, Approx
|