|
Works Related To Water-Distribution Pipelines - Reconstruction (Modernization) Of The Existing Koszalin-Mielno Water Main - Task Iii. 4.1. The Subject Of The Order Is The Implementation Of An Investment Task Titled: Reconstruction (Modernization) Of The Existing Koszalin-Mielno Water Main - Task Iii. The Works Will Be Carried Out On The Section Of The Koszalin-Mielno Main Line, From Plot No. 1/14, Precinct 0009 Miasto Koszalin, To Plot No. 129/3, Precinct 0018 Mścice. The Investment Covers The Area Of The Following Communes: Koszalin, Będzino And Mielno. 4.2. The Scope Of The Order Includes: A) Reconstruction Of The Existing Water Main From Dn400 Asbestos-Cement Pipes By Constructing A New Pipeline From Pe 100 Rc Dz315 Sdr17 Pipes Using The Trenchless Relining Method, On A Section Of Approx. 2,118 M, Along With The Performance Of Earthworks, Drainage, Assembly And Installation Works, Tightness Tests, Flushing And Disinfection; B) Modernization Of Existing Chambers No. Xvi And Xvii, Construction Of A New Kz-4 Gate Valve Chamber Made Of Prefabricated Reinforced Concrete Elements Dn2500, Installation Of Fittings, Dampers/Gate Valves With Electromechanical Drives, Electromagnetic Flow Meter, Aeration And Vent Valve, Pressure Gauges, Stainless Steel Piping, Ventilation, Drainage, Manholes, Ladders And Operating Equipment; C) Construction Of Electrical And Instrumentation Installations, Cable Routes, Power Supply, Control, Measurements And Commissioning Of Devices, Construction Of A Culvert Under The Access To The Kz-4 Chamber, Development Of The Area Near The Chambers, Including Concrete Pavement, Edges, System Fences And Gates, As Well As Preparation Of As-Built Documentation, Tests, Tests, Acceptances And Tidying Up The Area After The Completion Of The Works. 4.2.1. Compliance Of The Project With The Dnsh Principle: A) At Each Stage Of Implementation, The Contractor Is Obliged To Ensure Compliance With The Document Compliance Of Projects Financed From European Union Funds, Including Those Implemented Under The National Reconstruction And Resilience Plan, With The Principle Of Do No Significant Harm - The Dnsh Principle Manual For The Beneficiary, B) Execution Of The Order In Full Compliance With The Technical Guidelines On The Application Of The Principle Of Do No Serious Harm Damage Pursuant To The Regulation Establishing The Recovery And Resilience Facility 2021/C 58/01; C) Execution Of The Order In Full Compliance With The Document Statement On The Dnsh Principle - Do No Harm - Annex No. 12 To The Swz.
|