|
1. The Subject Of The Order Is The Performance Of Construction Works Consisting In The Thermal Modernization Of The Building Of The Primary School In Ruda Łańcucka, Located On The Plot No. 533/6, To Be Performed As Part Of The Implementation Of The Task Entitled Improvement Of The Energy Efficiency Of The Building Of The Primary School In Ruda Łańcucka. Scope Of Construction Works To Be Performed: 1) Replacement Of Window And Door Joinery - Demolition Works - Set - Pvc Windows With An Area Of Over 1.5 M2, Three-Glazed, Ral 7016 Color With A Warm Spacer, With A Heat Transfer Coefficient U = 0.9 [W/M2xk], Along With Window Frame Treatment - 22,208 M2, - Aluminum Windows With An Area Of Over 1.5 M2, Triple-Glazed, Ral 7016 Color With A Warm Spacer Frame, Heat Transfer Coefficient U = 0.9 [W/M2xk], Including Window Frame Treatment - 3,600 M2, - External Window Sills Made Of Coated Sheet Metal, Thickness 0.7 Mm, Matt Polyester, Anthracite Color Ral 7016, Expanded Width Over 25 Cm, - 3,672 M2, - Single-Leaf External Aluminum Door, Warm Profile, Glazing - Safety Glass, Door Heat Transfer Coefficient Umax = 1.3 [W/M2*K], Main Leaf Width Min. 90 Cm In The Clear Passage. Door Equipped With A Door Closer And Two Locks, Anthracite Color, Including Door Frame Treatment - 6,818 M22) Insulation Of External Walls And Flat Roof - Dismantling The Band Of Cubes Or Concrete Slabs On A Sand Bed, Filling The Joints With Sand, Fragments With Edges - 56,875 M2, A) Plinth Part: - Priming And Insulation Damp-Proof Vertical Foundation Walls Made Of Extruded Polystyrene Foam Boards, Xps Polystyrene 300 Gr. 10 Cm M For Glue - 86,742 M2, - Mesh, Primer And Thin-Layer Plaster Made Of Thin-Layer Polyhydrosilicone Plasters. 1.5 Mm - 42,750 M2, - Concrete Edges Previously Dismantled On A Cement-Sand Ballast, Joints Filled With Cement Mortar - 20% Of New Cubes Were Assumed In Place Of Concrete Slabs - 160 M2, - Surface Made Of Concrete Paving Stones Previously Dismantled On A Sand Ballast With Joints Filled With Sand - 57.00 M2, B) Walls Ground Floor: - Security And Preparation Works - Set - Priming And Insulating Building Walls Using Light Technology - Thin-Layer Plaster, Two-Time Painting - 840.200 M2 - Installation Of Acrylic Facade Boards On A Previously Prepared Substrate - Golden Oak Color 15 Cm X 2 M, Thickness 2 Mm - 20 M2 - Insulation Of Building Walls With 15 Cm Styrofoam Boards And Manual Execution Of The Facade Plaster With Silicate Plaster - 79,230 M2, C) Flat Roofs: - Dismantling Works Of Old Insulation - 940.0 M2, - Moisture-Proof Insulation Made Of Foil And Thermal And Anti-Sound Insulation Made Of 15 Cm Styrofoam Boards, Horizontal On The Top Of The Structure Dry - Insulation Of Ceilings With Eps 100 Polystyrene - Λ ≤ 0.036W/(Mk) Together With The Construction Of A Cement Floor - 950.0 M2, D) Painting The Roof And Chimneys - Making A Soffit Made Of Coated Trapezoidal Sheet Metal On Battens - 159.47 M2, - Carrying Out Demolition And Sheet Metal Flashing Coated (Nea
|