|
The Subject Of The Construction Project Is The Reconstruction And Expansion And Change Of Use Of Part Of The Building Of The Municipal Kindergarten In Działoszyn, For The Purposes Of Establishing A Day Home For Seniors. The Project Envisages The Following Construction Works: • Raising The Floor Level In Staircases (Laying Layers Of Styrofoam, Making A Screed And A Pvc Floor); • Making Grooves In The Floor For The Planned Water And Sewage Installation And Partition Walls; • Dismantling Damaged Installation Casings; • Dismantling Stair Railings; • Dismantling The Casing From Boards In Staircases; • Dismantling Existing Lighting Fixtures; • Disassembly Of Windows Intended For Replacement/Removal Along With Their Frames; • Dismantling Unnecessary Flashings And Window Sills; • Disassembly Of Interior Doors And Frames; • Dismantling Of The Suspended Coffered Ceiling; • Dismantling The Existing Pvc Floor (Rooms: 0/2, 0/3, 0/4, 0/8, 0/9, 0/11, 0/12, 0/13, 0/18, 0/19, 0/21, 0/24, 0/25, 0/26, 1/4, 1/5, 1/6, 1/7, 1/8, 1/15, 1/16, 1/17, 1/18, Other Rooms If Necessary); • Making Holes And Lintels In The Existing Walls For The Planned Passages; • Construction Works In The Preparation Room (Part Of The Kindergarten) After Making The Passage And The Opening For The Pass-Through Wardrobe - Necessary Plastering, Painting, Laying Tiles On The Walls, Relocating The Existing Installations: Electrical, Water And Sewage, Plasterboard Casing Of The Designed Water And Sewage Installations. Kindergarten Premises; • Plugging The Existing Openings Of Gravity Ventilation Ducts; • Building Partition Walls From Aerated Concrete And Installing Walls From Plasterboards; • Execution Of Internal Plasters On New Walls; • Installation Of Doors And Windows With Frames; • Execution Of Leveling Layers And Grinding For New Floors; • Construction Of New Floors (Stoneware, Pvc); • Installation Of Fire Curtain And Air Intake Doors In Staircases; • Construction Of An Elevator Shaft; • Delivery And Installation Of A Passenger Lift; • Installation Of Pvc Gutters And Downpipes; • Installation Of Frosted Milk Foil On Some Windows; • Execution Of The Following Installations: Electrical, Telecommunications, Fire Alarm, Water And Sewage, A7 Ventilation, Central Heating, Domestic Hot Water, Hydrant; • Construction Of Plasterboard Casings For All Installations; • Abrasion Of Existing Internal Plasters; • Painting Walls And Ceilings; • Installation Of Windshield Wipers At The Main Entrance; • Installation Of Canopies Over Entrances; • Installation Of Stair Railings And Handrails Made Of Stainless Steel; • Installation Of Laminated Board Cabins For Sanitary Facilities; • Delivery And Installation Of Facilities And Equipment; • Installation Of Smoke Exhaust Windows (Walling Up The Lower Part Of The Existing Openings); • Installation Of External And Internal Window Sills; • Installation Of The Ei30 Roof Hatch And The System Ladder; • Construction Of A Fire Separation Wall On The Buildings Facade (Wall M
|